My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/21/1998
CBCC
>
Meetings
>
1990's
>
1998
>
7/21/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:57 PM
Creation date
6/17/2015 11:09:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/21/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-1 <br />0 <br />DRAFT - DRAFT -- Letter to be signed by ALL BCC <br />Letter to U.S. House and Senate Appropriations Committee Members <br />A number of your _ (fill in the Representative's state) constituents are visitors and winter resi- <br />dents in Martin County. They come hen: to share our love and enjoyment of the St. Lucie Estuary. <br />This spring we had an unnatural disaster in Martin County. Discharges from the Federal Flood <br />Control System for South Florida destroyed our St. Lucie Estuary and caused an epidemic of diseased <br />fish that is still with us. <br />These discharges from Lake Okeechobze destroyed our economy and our environment. We will <br />recover, but until the Central and South Florida Flood Control Project (Everglades Restoration) is totally <br />rebuilt, we will fact the same kind of discharges on a regular basis. <br />To protect and restore our estuary we need full and continuing funding for. <br />- Kissimmee Restoration, <br />- The Everglades Restudy, and <br />- Restudy Critical Projects. <br />Without restoration of the Kissimmee River, destroyed by a federal flood control project, pol- <br />luted runoff will continue to be rapidly routed to Lake Okeechobee. When Lake levees are threatened, <br />massive discharges to tide will result which destroy our estuary. Without the Everglades Restudy, there <br />is no alternative to these discharges. Without the Critical Projects which ace already planned and ready <br />to go, the Restudy benefits will be much mote uncertain and much slower in coming. <br />WRDA 98 is the funding vehicle for these projects. The Corps' recommended budget has al- <br />ready been painfully reduced by Senate Appropriations. The House WRDA budget destroys our Critical <br />Project funding and halts Kissimmee Restoration. It has crippling reductions for the Restudy itself. <br />These projects are not just important to Martin County and the St. Lucie Estuary. They are the <br />key to Everglades Restoration as well. Everglades National Park, the Biscayne National Monument, the <br />Florida Keys National Marine Sanctuary, the Big Cypress National Preserve, and the Loxahatchee Na- <br />tional Wildlife Refuge are all hurting and will suffer continuing degradation until the Restudy is imple- <br />mented. <br />We need your help. <br />Please call if you have any questions. <br />Sincerely, <br />5 BCC <br />Commissioner Ginn queried whether the Board wanted to express its concern over the <br />lack of support to the Congressional delegation. <br />Commissioner Adams felt there was not enough information and assumptions were <br />being made regarding the causes of the various problems. There is an ongoing study being <br />done. <br />After discussion, Commissioner Adams thought it was interesting that people assume <br />the water from a dam is released over the top when, in fact, it is released from the bottom <br />with all of the muck. <br />No action was taken. <br />July 21, 1998 <br />-29- <br />Boof J 'PAGE 4366 <br />
The URL can be used to link to this page
Your browser does not support the video tag.