Laserfiche WebLink
0 <br />OBJECTIVE 3 Po able Water and Groundwater Quality <br />Through 2020, the county potable water system will continue to meet the standards of the Federal <br />Safe Drinking Water Act, Public Law 93-523; the Florida Safe Drinlang Water Act, Section 403.850 <br />- 403.864, FS; Chapter 381, FS; and Rules 62-550, 40C-2, 40C-3,17-22, and 64E-8, FAC. <br />POTICg_3-t - The County shall continue to use the Floridan Aquifer as the primary source <br />of potable water and use reverse osmosis as the principal raw water treatment method for its <br />regional potable water system. With that water source and treatment method, the county will <br />provide its customers with good quality water that meets the requirements of the Federal Safe <br />Drinking Water Act, Public Law 93-523; the Florida Safe Drinking Water Act, Section <br />403.850 - 403.864, FS; Chapter 381, FS; and Rules 62 -550,40C -2,40C-3,17-22, and 64E-8, <br />FAC. <br />POL.TCY 3.2 The county, through the Environmental Health Department, shall monitor and <br />evaluate all private water treatment plants. The results of this evaluation shall be considered <br />during the prioritization of potable water service expansion. <br />Community Development Department Indian River County 33 <br />CHERRYWOOD ESTATES WATER SERVICES <br />INDIAN RIVER COUNTY PROJECT # UW - 98 - 05 - DS <br />ESTIMATED CONSTRUCTION COST <br />CONSTRUCTION ITEMS <br />QUANTIT UNIT <br />UNIT <br />SUBTOTAL <br />PRICE <br />MOSILIZATION,INSURANCE <br />1 <br />LS <br />3,000.00 <br />3,000.00 <br />VIDEO RECORD <br />1 <br />LS <br />700.00 <br />700.00 <br />12"X8" WET TAP W/ VALVE <br />1 <br />LS <br />2,500.00 <br />2,500.00 <br />6" GATE VALVE <br />1 <br />LS <br />800.00 <br />800.00 <br />LINE EXTENTION <br />360 <br />LF <br />11.25 <br />4,050.00 <br />6" PVC WM <br />1,280 <br />LF <br />10.00 <br />12,800.00 <br />6" DIP WM <br />80 <br />LF <br />18.00 <br />1,440.00 <br />ADD COST FOR FLANGE,RESTRAINERS/ MA <br />1 <br />LS <br />11000.00 <br />1,000.00 <br />AIR RELEASE VALVE <br />1 <br />UNIT <br />200.00 <br />200.00 <br />FHA <br />1 <br />UNIT <br />1,800.00 <br />11800.00 <br />1" SINGLE SHORT SERVICES <br />10 <br />UNIT <br />400.00 <br />4,000.00 <br />1" SINGLE LONG SERVICES <br />5 <br />UNIT <br />500.00 <br />2,500.00 <br />1.5" DOUBLE LONG SERVICES <br />2 <br />UNIT <br />700.00 <br />1,400.00 <br />2" SINGLE LONG SERVICES <br />2 <br />UNIT <br />800.00 <br />1,600.00 <br />2" BLOW OFF <br />1 <br />UNIT <br />200.00 <br />200.00 <br />DRIVEWAYS BORING <br />140 <br />LF <br />20.00 <br />2,800.00 <br />ASPHALT ROAD BORING <br />35 <br />LF <br />20.00 <br />700.00 <br />T WIDE SODDING <br />1,300 <br />L.F <br />2.50 <br />3,250.00 <br />ACAD/GPS AS -BUILT <br />1 <br />LS <br />4,500.00 <br />4,500.00 <br />SUBTOTAL <br />$ <br />49,240.00 <br />10% CONTINGENCY <br />$ <br />4,900.00 <br />ESTIMATED CONSTRUCTION COST <br />$ <br />54,140.00 <br />PERMIT <br />1 <br />LS <br />500.00 <br />500.00 <br />ACAD DRAWING <br />1 <br />LS <br />11000.00 <br />1,000.00 <br />ENGINEERING <br />150 <br />HRS <br />30.00 <br />4,500.00 <br />ADMINISTRATIVE EXPENSES <br />1 <br />LS <br />2,700.00 <br />2,700.00 <br />TOTAL ESTIMATED PROJECT COST <br />$ <br />62,840.00 <br />TOTAL ASSESSIBLE AREA (SOFT) <br />502 593 <br />ESTIMATED COST PER SOFT <br />AUGUST 189 1998 <br />$ 0.12503(1159 <br />V � C - 1 wq, 7 � _ �► ��1Wv �0 <br />-37- <br />Ma JLUG P-�n,f <br />