0
<br />OBJECTIVE 3 Po able Water and Groundwater Quality
<br />Through 2020, the county potable water system will continue to meet the standards of the Federal
<br />Safe Drinking Water Act, Public Law 93-523; the Florida Safe Drinlang Water Act, Section 403.850
<br />- 403.864, FS; Chapter 381, FS; and Rules 62-550, 40C-2, 40C-3,17-22, and 64E-8, FAC.
<br />POTICg_3-t - The County shall continue to use the Floridan Aquifer as the primary source
<br />of potable water and use reverse osmosis as the principal raw water treatment method for its
<br />regional potable water system. With that water source and treatment method, the county will
<br />provide its customers with good quality water that meets the requirements of the Federal Safe
<br />Drinking Water Act, Public Law 93-523; the Florida Safe Drinking Water Act, Section
<br />403.850 - 403.864, FS; Chapter 381, FS; and Rules 62 -550,40C -2,40C-3,17-22, and 64E-8,
<br />FAC.
<br />POL.TCY 3.2 The county, through the Environmental Health Department, shall monitor and
<br />evaluate all private water treatment plants. The results of this evaluation shall be considered
<br />during the prioritization of potable water service expansion.
<br />Community Development Department Indian River County 33
<br />CHERRYWOOD ESTATES WATER SERVICES
<br />INDIAN RIVER COUNTY PROJECT # UW - 98 - 05 - DS
<br />ESTIMATED CONSTRUCTION COST
<br />CONSTRUCTION ITEMS
<br />QUANTIT UNIT
<br />UNIT
<br />SUBTOTAL
<br />PRICE
<br />MOSILIZATION,INSURANCE
<br />1
<br />LS
<br />3,000.00
<br />3,000.00
<br />VIDEO RECORD
<br />1
<br />LS
<br />700.00
<br />700.00
<br />12"X8" WET TAP W/ VALVE
<br />1
<br />LS
<br />2,500.00
<br />2,500.00
<br />6" GATE VALVE
<br />1
<br />LS
<br />800.00
<br />800.00
<br />LINE EXTENTION
<br />360
<br />LF
<br />11.25
<br />4,050.00
<br />6" PVC WM
<br />1,280
<br />LF
<br />10.00
<br />12,800.00
<br />6" DIP WM
<br />80
<br />LF
<br />18.00
<br />1,440.00
<br />ADD COST FOR FLANGE,RESTRAINERS/ MA
<br />1
<br />LS
<br />11000.00
<br />1,000.00
<br />AIR RELEASE VALVE
<br />1
<br />UNIT
<br />200.00
<br />200.00
<br />FHA
<br />1
<br />UNIT
<br />1,800.00
<br />11800.00
<br />1" SINGLE SHORT SERVICES
<br />10
<br />UNIT
<br />400.00
<br />4,000.00
<br />1" SINGLE LONG SERVICES
<br />5
<br />UNIT
<br />500.00
<br />2,500.00
<br />1.5" DOUBLE LONG SERVICES
<br />2
<br />UNIT
<br />700.00
<br />1,400.00
<br />2" SINGLE LONG SERVICES
<br />2
<br />UNIT
<br />800.00
<br />1,600.00
<br />2" BLOW OFF
<br />1
<br />UNIT
<br />200.00
<br />200.00
<br />DRIVEWAYS BORING
<br />140
<br />LF
<br />20.00
<br />2,800.00
<br />ASPHALT ROAD BORING
<br />35
<br />LF
<br />20.00
<br />700.00
<br />T WIDE SODDING
<br />1,300
<br />L.F
<br />2.50
<br />3,250.00
<br />ACAD/GPS AS -BUILT
<br />1
<br />LS
<br />4,500.00
<br />4,500.00
<br />SUBTOTAL
<br />$
<br />49,240.00
<br />10% CONTINGENCY
<br />$
<br />4,900.00
<br />ESTIMATED CONSTRUCTION COST
<br />$
<br />54,140.00
<br />PERMIT
<br />1
<br />LS
<br />500.00
<br />500.00
<br />ACAD DRAWING
<br />1
<br />LS
<br />11000.00
<br />1,000.00
<br />ENGINEERING
<br />150
<br />HRS
<br />30.00
<br />4,500.00
<br />ADMINISTRATIVE EXPENSES
<br />1
<br />LS
<br />2,700.00
<br />2,700.00
<br />TOTAL ESTIMATED PROJECT COST
<br />$
<br />62,840.00
<br />TOTAL ASSESSIBLE AREA (SOFT)
<br />502 593
<br />ESTIMATED COST PER SOFT
<br />AUGUST 189 1998
<br />$ 0.12503(1159
<br />V � C - 1 wq, 7 � _ �► ��1Wv �0
<br />-37-
<br />Ma JLUG P-�n,f
<br />
|