My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/1/1998
CBCC
>
Meetings
>
1990's
>
1998
>
9/1/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:58 PM
Creation date
6/17/2015 11:14:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/01/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />PHILIP S. STEEL A.1 A. ARCHITECT <br />Kul Zimmermann, C F.C., Tax Collector May 29,1998 <br />Indian River County <br />Vero Beach. FL 32961 <br />Fax #561-770-5009 <br />R Additions & Remodeling, Luria's Plaza Vero 19cuh, FL <br />Pea Mr, Zirnmemann: <br />On May 19, 3996 the following oonitruetion bids were received for the above referenced project. All contractors <br />based their bids on drawings, specifications and addendum prepared by this office. The biddtxs wens prc-qualified <br />and enjoy Bn excellent reputation. <br />The list of bidding contractors and proposals are as follows: <br />Bill Bryant & Assooistes. Inc. 5296,804.00 <br />Metropolitan construction, Inc. $296.950.00 <br />BatthConstrucdon, Inc. $322,993.00 <br />Parent construction 5323,420.00 <br />The low bidder is Bill Bryant tit Awoeiates and will be awarded tho contract when executed. The bidders were <br />instructed to divide their bids based on an aara ment between the Tax Collector and the landlord, Stoltz Proporty <br />Management. <br />Stoltz Property Management financial obligation is to construct an additional 2100 square feet adjoining and wost of <br />the caisting apace, all circ work. and remodeling the existing space into like new coaditioA. The Tax Collector is <br />responsible for all interior partitions, cabinetry and built-ins, carpet, wall finishes, signage, additional hmudicapped <br />plumbing, special electrical and HVAC requirtmenu. <br />Construction cost division foe lasxllard/imm is as follows: <br />Landlord $13),000.00 <br />Tenant 1162,004.00 <br />Tota 5245,804.00 <br />I hope this synopsis is satisfactory. Any questions, plea 1. <br />sincerely 2 <br />illy <br />AAA, tees <br />Pss/rf <br />1010 ttAlaaa'laww natvs. svt F617 p1 iCs. FLORID >94144 - $61-113.1312 FAX $41-M-11111 <br />A I R C TRX CILIECTO2 Fax :561-770-5009 - 3un 2 '98 12:57 P.04 <br />Since we do not have Board of County Commission approval at this time, the <br />initial use would be for non -county business only, hence two employees <br />remaining at the Administration building pending Board approval. <br />Additional concern Is the fact that 12% of my main office work force had been <br />diagnosed with Carpal Tunnel Syndrome and I have a responsibility to configure <br />work stations ergonomically to reflect the continuously Increasing time spent on <br />computer terminals. None of our work areas meet standards complying with <br />ergonomic needs. <br />Additional cost considerations include the following: <br />Monthly <br />Rent <br />p4,95B.33 <br />CAM <br />752.50 <br />Taxes <br />1,073,33 <br />Utility Bill <br />400.00 Est. <br />Janitorial Service <br />350.00 Est. <br />Pest Control <br />40.00 Est. <br />Window Cleaning <br />25.00 Est. <br />SEPTEMBER 1, 1998 <br />-67- <br />• <br />BOOK JOS FaGE r ��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.