My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/20/1998
CBCC
>
Meetings
>
1990's
>
1998
>
10/20/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:59 PM
Creation date
6/17/2015 11:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/20/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Adams asked how long the bridges would be closed under Alternat ive <br />No. 2, and Public Works Director James Davis advised the bridges would be closed 3-4 <br />months for total replacement. There is a possibility to detour up to 109`h Street; that bridge <br />was rebuilt about two years ago. It would be about a 1 -mile detour. The cost of a temporary <br />bridge over the Park Lateral Canal would be costly, about $60,000. <br />Commissioner Ginn thought they should go forward with a new bridge. <br />MOTION WAS MADE by Commissioner Ginn, SECONDED <br />by Commissioner Macht to approve Alternative No. 2, as set <br />forth in the memorandum. <br />Under discussion, Commissioner Adams inquired of Director Davis about the status <br />of other bridges and if he had any success in talking with the "Control District" about use of <br />box culverts. <br />Director Davis responded concerning the other bridges and advised that his discussion <br />with the "Control District" (Indian River Farms Water Control District and Fellsmere Farms <br />Water Control District) was not successful regarding the two Fellsmere bridges, but there is <br />a possibility for the rangeland canal bridge on 26'. <br />The Chairman CALLED THE QUESTION and the motion <br />carried unanimously. (4-0, Commissioner Eggert absent) <br />11.G.5. ROADWAY MAINTENANCE - 79th STREET WEST OF <br />WILLOW STREET (1.3 MILES) AND PAVING 74th AVENUE SOUTH <br />-.OF SR60 TO 16th STREET (% MILE) <br />The Board reviewed a Memorandum of October 6, 1998 <br />TO: James E. Chandler, <br />County Administrator <br />DATE: October 6, 1998 <br />FROM: James W. Davis, P.E., �} <br />Public Works Director, .J <br />SUBJECT: 1) Request by Property Owners for the County to Accept <br />Roadway Maintenance -79t�' Street west of Willow Street <br />(1.3 miles) <br />2) Paving 74th Avenue south of SR60 to 16t�h Street (1/2 mile) <br />REF. LETTER: Jon Jansen to Jim Davis dated Aug. 31, 1998 <br />October 20, 1998 <br />C -i <br />BOOK 107 PAGE© 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.