My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/1998
CBCC
>
Meetings
>
1990's
>
1998
>
11/17/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:59 PM
Creation date
6/17/2015 11:27:03 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/17/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />ON MOTION by Commissioner Ginn, SECONDED <br />by Commissioner Macht, the Board, by a 3-2 vote <br />(Commissioners Adams and Stanbridge opposed) <br />granted the special exception use approval for the <br />education facility with the following conditions: (1) <br />prior to site plan release, the applicant must confirm <br />that the educational facilities will meet the minimum <br />spatial requirements utilized by the Indian River <br />County School Board and the State of Florida; (2) <br />the property owner shall not permit the planting of <br />and shall allow for the removal of any wild growing <br />Caribbean fruit fly host plants; prior to the issuance <br />of a Certificate of Occupancy for Phase I, (3) the <br />sidewalk along 58'b Avenue shall be constructed or <br />otherwise guaranteed in accordance with County <br />regulations; (4) the project's 12' Street frontage <br />shall be paved from 58'h Avenue to the nearest 12`h <br />Street driveway; (5) the developer shall construct a <br />westbound left turn lane for the project's <br />easternmost 12" Street driveway; (6) that the lighting <br />of any recreational field must be approved by the <br />Planning and Zoning Commission; (7) between the <br />west site boundary and the proposed tennis courts, a <br />setback of at least 100 feet shall be maintained and <br />a 50 foot setback shall be maintained for the <br />proposed soccer and baseball fields; (8) prior to <br />issuance of a Certificate of Occupancy for Phase I, <br />a Type "B" buffer shall be installed and maintained <br />along the entire west property line; and (9) prior to <br />construction or use of all fields and outdoor <br />recreational improvements within Phase III, the <br />applicant shall obtain final site plan approval for <br />such uses/facilities from the Planning and Zoning <br />Commission. <br />NOVEMBER 17, 1998 <br />-39- <br />• <br />BOOK 10.7 PnE 654 <br />
The URL can be used to link to this page
Your browser does not support the video tag.