My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/19/1999
CBCC
>
Meetings
>
1990's
>
1999
>
1/19/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2015 9:13:03 AM
Creation date
6/17/2015 12:17:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/19/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />0 <br />CD <br />PM <br />00 <br />4 <br />a <br />z <br />M <br />Table 11 - Project Design Features for the lhdian River,County Beach PreservatioWPjan Projects <br />Sector <br />i— - ---` — <br />Project Description <br />Project Start <br />Project End <br />Recommended <br />Project Length <br />Estimated <br />Estimated <br />Sand <br />– <br />15 Yr Design Level <br />���a <br />O1 <br />CL <br />— -- – <br />.-► <br />O' <br />Cr <br />(feet) <br />Lem <br />Placement <br />Projject - Required <br />i/olume 8 <br />Recommended <br />Sand Placement <br />5 Yr Des'gn Level <br />Project <br />(cubic yards) <br />OlD <br />-Required <br />((DD <br />( D <br />C <br />k <br />G <br />Q! <br />y <br />a <br />N <br />y <br />N <br />p <br />CL <br />01 <br />O <br />.. <br />O <br />O <br />.r <br />N <br />N <br />Ranouriah <br />volume <br />olume(5 yr Renourish <br />1 <br />I Feeder Beach <br />R-4 (-40(Ijfeet) <br />T-11 (-50 feet) <br />7,482 <br />7,000 <br />560,000 <br />sv <br />O- <br />3 <br />=r <br />� <br />N <br />N <br />1 <br />c3 <br />O <br />d <br />r0 <br />M <br />C <br />3 <br />N <br />I <br />N' <br />® <br />rn <br />ut <br />a, <br />349,409 <br />400,000 <br />2 <br />fl <br />Feeder Beach <br />T-11 (-50 feet) <br />T-17 <br />5,790 <br />6,000 <br />240,000 <br />270,393 <br />300,000 <br />3 <br />Beach Restoration <br />R-37(+290 feet) <br />T-45(+100 feet) <br />7,892 <br />7,000 <br />280,000 <br />378,816 <br />380,000 <br />6b <br />Beach Restoration <br />R-74 (+6W feet) <br />R-86 <br />11,684 <br />91000 <br />360,000 <br />2 <br />$40,619 <br />6401080 <br />T-100 (-95 feet) <br />R-107 (+105 feet) <br />8,221 <br />7,000 <br />70,000 <br />7b <br />Restoration 8 Structures <br />L <br />W1000 <br />330,484 <br />- – <br />Totals <br />41,069 <br />38,0001,610,0W <br />1,539,237 <br />11950,000 <br />330,484 <br />NOTES: <br />1. Project start and end dimensions are based on property boundaries for the economic analysis <br />2. For project dimensions: + denotes a distance to the south, - denotes a distance to the north <br />3. Shoreline Change rates were obtained from the BPPU <br />4. Sector 3 excludes Orchid Island Subdivision <br />• <br />0 <br />OR <br />M= <br />a, <br />3 <br />O <br />���a <br />O1 <br />CL <br />.-► <br />O' <br />Cr <br />OlD <br />((DD <br />( D <br />C <br />k <br />G <br />Q! <br />y <br />a <br />N <br />y <br />N <br />p <br />CL <br />01 <br />O <br />.. <br />O <br />O <br />.r <br />N <br />N <br />O <br />O <br />c <br />� <br />N <br />N <br />W <br />�O',, <br />j <br />Q. <br />� <br />N <br />N <br />- <br />sv <br />O- <br />3 <br />=r <br />� <br />N <br />N <br />-4 <br />n <br />c3 <br />O <br />d <br />r0 <br />M <br />C <br />3 <br />N <br />I <br />N' <br />® <br />rn <br />ut <br />a, <br />• <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.