Laserfiche WebLink
GOOK 108 PAGE 152 <br />Ms. Erickson added that the State of Florida has a grant program, the Beach Control <br />Trust Fund. The main qualification for this grant is public access to the beaches. <br />Commissioner Adams noted that the Plan contains nothing specific on project design <br />as this is an economic analysis only. She asked Mr. Tabar to explain the phases. <br />Mr. Tabar explained that Phase One projects the benefits, discusses the funding <br />sources, contains the economic analysis and studies the feasibility of the project. Phase Two <br />will contain the specific design, costs, and legal procedures. Phase One was prepared and <br />presented to the Beach & Shore Preservation Advisory Committee who recommended <br />approval. <br />Chairman Macht opened the public hearing and asked if anyone wished to speak <br />regarding this matter. The Chairman also requested that remarks be kept as brief as possible. <br />(B) -PUBLIC INPUT <br />Ruth 1.Livingston, 1576 Smugglers Cove, presented the following to the Board: <br />19 January, 1999 <br />GOOB MORNING <br />I AM RUTH LIVINGSTON, 1576 SMUGGLERS COVE, OCEAN FRONT FOR <br />24 YEARS. ALSO OCEANFRONT PROPERTY OWNER FOR 36 YEARS IN <br />MIDDLESEX BEACH, DE. <br />I'D LIKE TO CONGRATULATE ALL CONCERNED FOR BRINGING THE PLAN- <br />ING FOR NOURISHING INDIAN RIVER COUNTY BEACHES CLOSER TO <br />FRUITION THAN EVER BEFORE. <br />HOWEVER, THERE ARE AREAS OF CONCERN: <br />FUNDING AND TIMING <br />FUNDING: <br />THE BEACH PRESERVATION COMITTEE HAS ACKNOWLEDGED THAT THEIR <br />ESTIMATED COSTS PER CUBIC F00 T ARE HIGH. IT WOULD BE INAPPRO- <br />PRIATE TO LEVY ASSESSMENTS ON PRIVATE PROPERTY UNTIL REALISTIC <br />COSTS ARE DETERMINED. <br />TIMING: <br />ACTUAL NOURISHMENT IS STILLSOME TIME INTHE FUTURE. WHILE <br />SOME PROPERTIES ARE CURRENTLY IN EXTREMIS. THESE CRITICAL <br />AREAS SHOULD BE PROVIDED IMMEDIATE RELIEF. PUSHING SAND OR <br />DUMPING SAND WHERE SAND IS NOT AVAILABLE SHOULD BE PER- <br />MITTED NOW WITH PRIVATE PROPERTY OWNERS PAYING THEIR OWN <br />WAY. OUR EXPERIENCE INDCATES A COST OF ABOUT $2.00 PER <br />FOWT FOR SCRAPING AND PLANTING.EXPERIENCE OVER A PERIOD FROM <br />JANUARY 19, 1999 <br />-68- <br />