Laserfiche WebLink
r— <br />BOOK 103 FAGE 697 <br />building adjacent to a drive that links 18"' Avenue north 27"' Street to 180 street south of 26'° <br />street. A public plaza with reflecting pool and fountain is proposed at the intersection of the two <br />main building volumes to establish an appropriate scale and character for the main public <br />building in Indian River County. Public parking will occur west of the new building in surface <br />lots. <br />Employee parking will occur west of the public parking and north of 27' Street in surface lots. <br />The north lot will also provide parking and access for the warehouse facility sited directly north <br />of the proposed administration building. Employee entrance to the administration building will <br />occur from the north through the same lobby used by the public coming from the south. <br />Even though it is only a good guess at this time, the planning team felt it was appropriate to show <br />where, when and how much future expansion space will be required beyond the year 2010. <br />Shown as Phase II in this report is an administrative addition of 40,000 SF (two stories) west of the <br />Phase I Building. When this addition is built beyond 2010, its square footage will require an <br />additional 120 parking spaces. Also, sixty-five cars displaced by the new construction, must be <br />replaced. The total of 185 spaces will be built in the northern surface lot as shown in the Phase II <br />site plan. <br />Parking Calculations <br />Phase I <br />Proposed Phase I Administration Building. <br />-163,980 GSF @ 3 spaces/1000 SF = 492 spaces required. <br />Proposed Purchasing/Buildings and Grounds/Probation Building <br />-27,985 GSF @ 3 spaces/1000 SF = 84 spaces required. <br />Total Parking Required 576 spaces <br />Total Parking Provided 576 spaces <br />Phase II <br />Phase I Administration Bldg. 163,980 GSF = 492 space required. <br />Phase If Administration Bldg. 40,000 GSF = 120 spaces required. <br />Purchasing/Buildings and Grounds/Probation Building = 84 spaces required. <br />Total Parking Required - 696 spaces. <br />Total Parking Provided — 696 spaces <br />Prior to completing this master planning task, Indian River County asked the planning team to <br />evaluate the vacant Vero Mall to ascertain whether or not it could be utilized as the County <br />Administrative Facility. The planning team believes the vacant mall is inappropriate for <br />conversion to the County Administrative Facility. That study is included as Appendix A with this <br />report. <br />MARCH 16, 1999 <br />_g2_ <br />