Laserfiche WebLink
f <br />�a <br />FINAL ASSESSMENT ROLL FOR PAVING AND DRAINAGE IMPROVEMENTS <br />TO: AIRPORT DRIVE ADJACENT TO COLLIER CLUB IN SEBASTIAN, <br />FLORIDA IN ROSELAND GARDENS S/D PAVING & DRAINAGE PROJECT <br />C3 TOTAL FRONT FEET ................................... 1,427.97 <br />CD COST TO PROPERTY OWNERS ................. $20,519.93 <br />PROJECT NO. 9811 COST PER FRONT FOOT ............................. $14.37 <br />9811 FIN2.WK4 <br />1,427.97 $14.37 20,519.93 20,519.91 <br />TOTAL FRONT COST PER F.F. TOTAL COST TOTAL ASSESSMEA <br />FOOTAGE <br />I'AH I <br />11 <br />E f 03 <br />U <br />ON <br />GN <br />ON <br />rl <br />I- <br />• <br />r <br />N <br />O <br />• <br />FRONT <br />ASSESSMENT <br />NAME & ADDRESS <br />LEGAL DESCRIPTION <br />FOOTAGE <br />COST/F.F. <br />TOTAL COST <br />COST <br />13. Herbert & Kathleen Severance <br />11-31-38-00003-0030-00003.0 <br />120 <br />$14.37 <br />$1,724.40 <br />$1,724.40 <br />3556 Lucia Drive <br />Roseland Gardens SID, PBI 8-25, E 12 Lot 3 and all <br />Vero Beach, FL 32967 <br />Lot 4, Block 3 <br />14. Herbert& Kathleen Severance <br />11-31-38-00003-0030-00005.0 <br />120 <br />$14.37 <br />$1,724.40 <br />$1,724.40 <br />3556 Lucia Drive <br />Roseland Gardens S/D, PBI 8-25, Lot 5 & NW 12 <br />Vero Beach, FL 32967 <br />of Lot 6, Block 3 <br />15. Frieda Ross <br />11-31-38-00003-0030-00006.0 <br />125 <br />$14.37 <br />$1,796.25 <br />$1,796.25 <br />11107 Airport Drive <br />Roseland Gardens SID, PBI 8-25, SEly 12 of Lot 6 <br />Sebastian, FL 32958 <br />& all of Lot 7, Block 3 <br />9811 FIN2.WK4 <br />1,427.97 $14.37 20,519.93 20,519.91 <br />TOTAL FRONT COST PER F.F. TOTAL COST TOTAL ASSESSMEA <br />FOOTAGE <br />I'AH I <br />11 <br />E f 03 <br />U <br />ON <br />GN <br />ON <br />rl <br />I- <br />• <br />r <br />N <br />O <br />• <br />