My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/18/1999
CBCC
>
Meetings
>
1990's
>
1999
>
5/18/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:56 PM
Creation date
6/17/2015 12:37:29 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/18/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />DATE: November 16, 1998 <br />The Capital Projects Division of Public Works is asking for Board Approval for a single <br />source vendor/contractor to replace boat launching facilities at Donald MacDonald Park <br />Existing launching facility has exposed rebar, broken concrete, the ramp is too short, and <br />in general disrepair. <br />The Tedder Boat Ramp System is a unique system that requires no dewatering, lowering <br />the cost of the project The launching facility is in place in 7 -10 working days, being less <br />of an inconvenience to the public. This product has a national copyright and trademark <br />issued by the U.S. Patent Office. <br />Randall G. Tedder Construction, Inc. has been used as a single source vendor by <br />Department of Environmental Protection. <br />The cost of the new ramp is $34,615.00. The dock is estimated to cost less than <br />$5,000.00 and will be bid separately. We have a grant in the amount of $80,000.00 from <br />Florida Department of Environmental Protection (FDEP) Special Waterway Projects Grant. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that the Board approve the Single Source Contractor. The grant <br />requires no matching funds. <br />Commissioner Adams commended staff for their work on this project. <br />MAY 189 1999 <br />ON MOTION by Commissioner Ginn, SECONDED <br />by Commissioner Stanbridge, the Board <br />unanimously approved the single -source vendor, <br />Randall G. Tedder d/b/a Tedder Boat Ramp System, <br />as recommended by staff. <br />-59- BOOP; J f' F'>V- <br />
The URL can be used to link to this page
Your browser does not support the video tag.