Laserfiche WebLink
11.8.1. COUNTY ROAD 510 - FORCE MAIN INTERIM <br />EMERGENCY REPAIR AND FOLLOW-UP <br />CORRECTIVE ACTION - WABASSO CAUSEWAY - <br />DERRICO CONSTRUCTION CORPORATION - <br />MASTELLER & MOLER ENGINEERS - PROJECT US - <br />94 -22 -CS <br />The Board reviewed a Memorandum of June 1, 1999: <br />DATE: JUNE 1, 1999 <br />TO: <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: <br />DONALD R HUBBS, P.E. <br />DIRECTOR OF UT 1, CES <br />PREPARED <br />STEVEN J. DOYLE, P.E. ' <br />AND STAFFED <br />CAPITAL PROJECTS MANAGER <br />BY: <br />SUBJECT: COUNTY ROAD 510 FORCE MAIN INTERIM EMERGENCY REPAIR <br />AND FOLLOW-UP CORRECTIVE ACTION <br />INDIAN RIVER COUNTY PROJECT NO. US -9422 -CS <br />BACKGROUND <br />On August 4, 1998, County staff discovered a failed pipe support bracket for a 124nch diameter force main <br />suspended beneath the CR -510 bridge (Wabasso Causeway) where it crosses the Indian River. The 12 inch <br />diameter force main had been design, permitted and inspected by Masteller & Moler Consulting Engineers in <br />Association with KSM Engineering & Testing (Engineers). <br />On August 10, 1998, Staff presented to the Indian River County Board of County Commission findings and <br />courses of action to be taken to complete the repairs and modifications to the support system. The Board <br />authorized the release of funds and Staff proceeded to complete the necessary temporary and permanent <br />repairs / modifications to the pipe support system. <br />ANALYSIS <br />The Board authorized the Utility, pursuant to Agenda dated August 10, 1998 (copy attached) to proceed <br />with the repair of the pipe support system and subsequently the Utility contracted with Derrico <br />Construction Corp. and Metallurgical Testing Inc. to complete the repairs. The Metallurgist identified <br />"metal fatigue" as the primary source of the failure. <br />The Engineer; concluded that a cast -in-place concrete pipe support system was the most reliable fix and the <br />Utility proceeded accordingly. The repairs / modifications to thepipe support system were completed in two <br />steps. The first seep included the installation of additional support brackets, along time underside of the bridge. <br />The second step included the installation of cast -m -place concrete thrust restrain at selected points on the <br />pipeline. These steps were completed in August 1998 and in November 1998, respectively. <br />The Engineers in cooperation with the County have agreed to pay for a portion of the construction and <br />metallurgical testing services as a result of the required repairs and pipe support modifications. The <br />Engineers have verbally agreed to reimburse the County for the interim repairs and permanent fix to the <br />pipe support system as herein defined: <br />Description Amount ($1 <br />A. Emergency Repairs conducted by Derrico Construction Corp. $ 1,361.29 <br />B. Metallurgical Analysis performed by Metallurgical Testing, Inc. $ 350.00 <br />C. Metal Pipe Support Bracket fabrication by Murphy Industrial Fabricators, Inc. 675.00 <br />Total (Sum of A. thin C.) $2,386.29 <br />It has been recommended that the cost for the installation of the cast -in-place concrete thmst restraints be <br />borne by the County since the County would have incurred that expense had the concrete thrust restraints <br />been installed at the time the force main was initially installed. <br />JUNE 19 1999 <br />-29- <br />11 BOOK , `J rnu-L <br />