My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/22/1999
CBCC
>
Meetings
>
1990's
>
1999
>
6/22/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 11:25:19 AM
Creation date
6/17/2015 12:43:24 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/22/1999
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• O&M labor expenses escalated according to Teamster's Union contract, annual debt service <br />payments based upon no new borrowing during the five year planning period. Renewal and <br />replacement (R&R) annual transfers of 5% are utilized for ongoing renewal and replacement <br />of the water, sewer and sludge systems. <br />• The existing capital improvement program (CIP) is used for capital projection. It is assumed <br />that the user charge rates will be annually indexed for inflation at a rate of 2.5%. <br />Final rate recommendations: <br />During several workshops with the Utilities Advisory Committee and having <br />received substantial public input, a number of rate scenarios were considered and <br />modified during the process. Final recommendations coming before the Board of <br />County Commissioners today are as follows: <br />1. That the existing residential class be broken out into single-family residential, multi- <br />family and manufactured home communities with commercial remaining as a distinct <br />class according to land use as per County Code. <br />2. That base facility charge adjustment factors of 1.0 and 0.85 be applied to single -&roily, <br />multi -family and manufactured home communities respectively. <br />3. That the base facility charges be reduced for all classes and the volume charges be <br />adjusted to provide a conservation incentive and give customers greater control over <br />their bills. <br />4. That the sewer volume charge be billed at 100% of metered flow. <br />5. That a reclaimed water rate be established. <br />6. That the existing impact fee, renamed "capacity charge", be retained with an <br />equalization factor for MHC and W. <br />7. Ancilliary charges be modified and adopted. <br />8. Other changes to the current rate as contained in the attached draft rate schedules. <br />9. The Utility staff, using the newly aquired user charge computer model, will reevaluate <br />the rates and charges at least annually and report findings to the Utilities Advisory <br />Committee and the Board of County Commissioners. <br />OPTIONS <br />1. Move forward with the User Charge Study recommendations and adopt <br />the attached Resolution and Exhibit A, with a planned effective date of <br />October 1, 1999. Approve revisions of the County Code indicated in the <br />attached Ordinance to take effect upon filing with the Florida Secretary of <br />State. <br />2. Ask that the st4 consultant and Utilities Advisory Committee consider <br />additional scenarios and receive additional public comment. Authorize an <br />amendment to the consultant contract with Hartman & Associates, Inc. for <br />additional services. <br />RECOMMENDATION - <br />The Utilities staff in conjunction with Hartman & Associates, Inc., respectfully <br />recommends Option 1, that the Utilities Advisory Committee rate recommendations <br />be approved by Resolution No. 99- , effective October 1, 1999, and that the <br />Board of County Commissioners authorize adoption of Ordinance No. 99- , as <br />attached. <br />JUNE 22, 1999 <br />27 <br />• <br />BOOK In <br />PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.