My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/22/1999
CBCC
>
Meetings
>
1990's
>
1999
>
6/22/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 11:25:19 AM
Creation date
6/17/2015 12:43:24 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/22/1999
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � <br />BOOK i0j FA'UE <br />11.GA INDIAN RIVER COUNTY FAIRGROUNDS <br />AGRICULTURAL ARENA/EXHIBIT BUILDING - DESIGNBUILD <br />CONTRACT - BARTH CONSTRUCTION, INC. - PART H <br />AGREEMENT - AMENDMENT #1 - FINAL DESIGN. PERMITTING <br />AND CONSTRUCTION <br />The Board reviewed a Memorandum of June 11, 1999: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E., <br />Public Works Director <br />SUBJECT: Indian River County Agricultural Arena/Exhibit Building <br />Design/Build Contract with Barth Construction, Inc. <br />Part II Agreement <br />DATE: June 11, 1999 <br />DESCRIPTION AND CONDITIONS <br />The Contractor/Engineer for the Fairgrounds Agricultural Building <br />project at the County Fairground site (7965 58th Avenue)has <br />completed the Part 1 Agreement services under the Design/Build <br />Contract. A Preliminary Design Development Report has been <br />prepared which includes the following: <br />1. A recommended design of the building as described in the <br />"Indian River County Agricultural Arena/Exhibit Building Scope <br />of Work by Phase and General Specifications" dated May 6, 1999 <br />as prepared by Barth Construction, Inc. after County review <br />dated June 4, 1999. <br />2. A maximum guaranteed cost of $ 1,007,854 for the work. This <br />includes building construction, engineering and architectural <br />design, plans, meetings, construction observation, permit <br />fees, material testing, etc. The building pad fill and <br />compaction are not included. <br />3. A completion schedule of 270 calendar days to construct. <br />At this time, approval of the report is requested, and <br />authorization to proceed with Part II Design/Build Services is <br />requested. If approved, the Contractor/Engineer shall proceed with <br />Final Design, permitting, and construction. <br />ALTERNATIVES AND ANALYSIS <br />The Public Works Department staff reviewed the scope of work and <br />has negotiated a few changes. By the Road and Bridge Division <br />JUNE 229 1999 <br />72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.