My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/13/1999
CBCC
>
Meetings
>
1990's
>
1999
>
7/13/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:57 PM
Creation date
6/17/2015 12:47:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/13/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK iO b PAGE 7U <br />STEP 3. Land Development Permit or Permit Waiver: Reviewed and issued by staff for <br />construction of subdivision improvements (roads, utilities, drainage). <br />STEP 4. Building Permit(s): Reviewed and issued by staff for construction of buildings. <br />STEP 5. Final PD Plat approval: Review and recommendation made by staff. Final action <br />taken by the Board of County Commissioners. <br />STEP 6 Certificate of Occupancy: Reviewed and issued by staff for use and occupancy of <br />buildings. <br />The applicant is pursuing STEP 1 of the process. <br />Once a PD conceptual plan is approved, only minor modifications to the conceptual plan can be <br />approved at a staff level. Any changes proposed to an approved conceptual plan that would intensify <br />the site use (e.g. increase the maximum number of lots) or reduce compatibility elements (e.g. reduce <br />buffering) can be approved only via a process involving public hearings held by both the Planning <br />and Zoning Commission and the Board of County Commissioners. <br />♦ Proposed PD District for the Project Site <br />The subject site has an L-1 land use designation. This underlying land use designation allows a <br />variety of single-family districts and a multi -family zoning district, each of which has a maximum <br />density of 3 units/acre or less. Since the land use designation controls the use of the property by <br />limiting the zoning districts applicable to the property, any rezoning must be compatible with the <br />uses and densities allowed by the property's land use designation. Once a specific PD rezoning is <br />approved for a site, the applicable PD conceptual plan adopted as part of the rezoning will limit the <br />type of specific uses, densities, and dimensional criteria allowed on the subject site. <br />Although PD zoning district parameters are flexible, certain standards related to uses, compatibility <br />(buffering), infrastructure improvements, dimensional criteria, and open space areas are set forth in <br />Chapter 915 (P.D. Process and Standards for Development Ordinance) of the county's land <br />development regulations (LDRs). As reflected in the proposed conceptual PD plan, the proposed <br />PD district for the subject site contains the following elements as compared with the traditional RS -3 <br />zoning district. The project consists of 6 "villages" or pods, each of which contains a certain <br />residential product type. The individual "villages" are compared to the RS -3 zoning district <br />standards in the chart below. <br />July 13, 1999 <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.