My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/20/1999
CBCC
>
Meetings
>
1990's
>
1999
>
7/20/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:57 PM
Creation date
6/17/2015 12:48:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/20/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br />0 <br />BOOR iOJ PAGE <br />Recreational Benefit <br />The total recreational value of the County's beaches to an individual is estimated <br />as the average value of a day at the beach multiplied by the number of days <br />spent on average at the beach. To determine the recreational benefits <br />associated with the projects identified in the BPP, a beach user survey was <br />conducted to ascertain the characteristics of beach users on the Indian River <br />County beaches during summer and winter months. These surveys were <br />conducted between August 13 and October 11, 1998 for the summer period and <br />between March 26 and April 10, 1999 to determine beach user characteristics for <br />winter months. <br />These surveys determined that, on average, the value placed on a day at the <br />beach by respondents to the summer survey was $11.71 and the value placed <br />on a day at the beach by winter respondents was $ 14.32. The average value of <br />a day at the beach was multiplied by the number on days spent on average at <br />the beach for each beach sector to determine the total recreational benefit. The <br />net present value of the recreational benefits over the 30 year project horizon is <br />estimated at $71,719,063 for the entire project area. <br />Storm Protection Benefit <br />The storm protection benefit resulting from the beach restoration program was <br />computed for oceanfront property within a project area. The following factors <br />were taken into consideration: (1) anticipated land loss from erosion if the project <br />was not completed, (2) value of land that would be lost, (3) construction cost of <br />erosion control structures required if the project was not completed, and (4) <br />maintenance cost of erosion control structures. The aggregate net present value <br />of the storm protection benefit for all property abutting the project over a 30 -year <br />project horizon is estimated at $31,106,269. <br />Distribution of Project Benefits and Costs <br />The initial beach restoration projects will restore and improve 8.3 miles of <br />shoreline along the County's 22 miles of barrier island beaches. The restored <br />beaches will be renourished at intervals of approximately 8 years throughout the <br />30 -year project horizon. The present value of the initial beach restoration project <br />is approximately $16,286,567, based on a total initial project cost of $17,685,540. <br />The total 30 -year present worth benefits associated with storm protection <br />($31,106,269 or 30.3 percent) and recreational use ($71,719,063 or 69.7 <br />percent) is $102,825,332. The total 30 -year present worth cost for the County's <br />beach restoration projects is $33,884,070, resulting in a benefit to cost ratio of <br />3.03 to 1 (3:1), confirming the economic importance of improving the County's <br />beaches. <br />Recommended Funding Sources and Financing Plan <br />Four primary sources of revenue are available to the County to fund the cost of <br />the initial beach restoration projects. These sources are recommended based <br />JULY 209 1999 <br />-44- <br />
The URL can be used to link to this page
Your browser does not support the video tag.