My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/27/1999
CBCC
>
Meetings
>
1990's
>
1999
>
7/27/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:57 PM
Creation date
6/17/2015 12:49:44 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/27/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK ib J FACEa,20 <br />ANALYSIS: <br />An estimate was obtained from Southern Petroleum Systems, which was the firm that replaced <br />the lines and tanks at both the Sheriffs Office and Road and Bridge. The price to remove and <br />replace both dispensers is $8,535. Currently, we have a credit due us from Southern Petroleum <br />Systems in the amount of $2,044.07. If Southern Petroleum Systems was used , the net cost <br />would be $6,490.93. <br />Since we have used Southern Petroleum Systems for all the work up to this point, it makes <br />logical sense to issue a final change order and have the fuel dispensers replaced utilizing the <br />savings that could be obtained from the credit due back to the County. <br />RECOMMENDATION: Authorize Change Order Number Three to be issued for the <br />replacement of two fuel dispensers at the Sheriffs Office for $8,535.00. With the credit <br />($2,044.07) due the County, the net total amount of the replacement will not exceed $6,490.93. <br />General Services Director Tom Frame reviewed the memorandum and staffs <br />recommendation. <br />Chairman Macht recalled that the Council of Public Officials had originally <br />recommended that the combined fueling facility with the School Board also include the <br />Sheriff's Department. He asked if combining the Sheriff's Office with the County/School <br />Board's facility had been discussed as he felt it would result in many savings. <br />Public Works DirectorJames Davis advisedthatthe consultanthad done apreliminary <br />study. The plan is that the County's, the School Board's, and the Sheriff s Department's fuel <br />needs will be served in that to -be -built facility. Undersheriff Jim Davis has been a part of <br />the planning and everyone is on the same page. The recently received environmental study <br />on the land shows that the 25 -acre site is clean. He expected the Option Agreement to be <br />exercised prior to the August 4'h deadline. <br />There was a brief discussion of why southern Petroleum Systems was chosen and <br />why the credit existed in this instance. County Attorney Vitunac explained the applicable <br />law. <br />ON MOTION by Commissioner Stanbridge, SECONDED BY <br />CommissionerAdams, the Board unanimously approved Change <br />Order Number 3 to the contract with Southern Petroleum <br />Systems in the net amount of $6,490.93, as recommended by <br />staff. <br />JULY 27, 1999 <br />78 <br />_I <br />
The URL can be used to link to this page
Your browser does not support the video tag.