Laserfiche WebLink
8WUn <br />ON MOTION by Commissioner Adams, SECONDED BY <br />Commissioner Stanbridge, the Board unanimously (4-0, <br />Commissioner Ginn absent) approved the Single Source <br />contractor, Randall G. Tedder Construction, Inc., as <br />recommended in the memorandum. <br />a F'AGE <br />n `0 72-` ` <br />11.H.1. SMITH WAREHOUSE FORCE MAIN AND WATER MAIN <br />CONSTRUCTION - DEVELOPER'S AGREEMENT WITH JERRY <br />SMITH <br />The Board reviewed a Memorandum of August 30, 1999: <br />DATE: AUGUST 30,1999 <br />TO: JAMES E. CHANDLER <br />COUNTY ADNW41STRATOR <br />FROM: DONALD R HUBBS, E. <br />DIRECTOR OF UTILITY S <br />PREPARED STEVEN J. DOYLE, P.E. <br />AND STAFFED CAPrrAL PROJECTS ANAG <br />BY: <br />SUBJECT. DEVELOPERS AGREEMENT FOR SMITH WAREHOUSE <br />FORCE MAIN & WATER MAIN CONSTRUCTION <br />BACKGROUND <br />Smith Warehouse is a proposed 6,000 square foot commercial development located at the northwest comer of <br />Second Street and Haigh Street, just south of CR -512. A 6 -inch force main and an 84nch waterline is planned <br />along High Street to serve current establishments and future developments south of Second Stra t. The force <br />main shall be constructed along the east side of High Street and the water line on the west. The property <br />owner, Jerry Smith, has agreed to enter into a cost sharing agreement with the County to construct the proposed <br />force main and water line in conjunction with their site development <br />Attached is a proposed developer's agreement with Jerry Smith for reimbursement of a portion of the subject <br />force main and water line. <br />ANALYSIS <br />As shown m Exhibit B of the attached Agreement, the estimated cost sharing between the Developer and the <br />Country is as follows: <br />Description <br />.. --- �^- •� — — ut , W—r- <br />Water Diift button System <br />Wastewater Collection System <br />Total <br />Developer's Share(*) <br />$1,462.50 <br />$4,988.00 <br />$6,450.50 <br />County's Share <br />$16,250.50 <br />$12,847.00 <br />$29,097.50 <br />Total Cost <br />$17,713.00 <br />$17,835.00 <br />$35,548.00 <br />+ <br />_ _ <br />� wacmon charges at a minimum of 61125/k for water and $15.77/ft. for sewer <br />pursuant to ResoMon 99-58. <br />SEPTEMBER 7, 1999 <br />102 <br />