Laserfiche WebLink
I <br />BOOK i mu 9 <br />J 82 <br />ANM=xhibit A of the Mwhcd fit, the estimated cost sharing between the Developer and the Cormly is as <br />As shown in E <br />follows: <br />Developer's Slow = $12,240.06 County's Share = $167,559.94 Total lrroject Cost = 5179,800.00 <br />RECOMME MAMM <br />The Developer will be reimbursed for eonsuuction based on payment of water / sewer capacity dhaWs, lie extenaw fees <br />and other eonaearon fees. Conmucuon of the water main and force main will allow the County to coordinate expansion of <br />*c <br />dism'bution and wastewater collection system with development of the site and 4acent properties. The County' <br />will be funded from the capacity c]rarge foe fund. (See below for amount number.) <br />RECO AGM— AM <br />The staff of the Department of Utility Services recommends that the Bowd of County Commissioners approve the attached <br />Developer's agreement as presented, and authorize the Chaimran to Monte the same. <br />4ACCOOM No.: 472-000-169-370.00 Utr7ity Cepacky Charge Fund M-0 : 5167,559.94 <br />MOTION WAS MADE by Commissioner Ginn, SECONDED <br />BY Commissioner Stanbridge, to approve staff's <br />recommendation. <br />Under discussion, Utilities Department Director Don Hubbs assured Commissioner <br />Ginn that the construction would be overseen and inspections would be done as the project <br />is underway. <br />The Chairman CALLED THE QUESTION and the motion <br />carried unanimously. (4-0, Commissioner Adams absent) <br />DEVELOPER'S AGREEMENT IS ONFILE <br />IN THE OFFICE OF TBE CLERK TO TBE BOARD <br />B.A. CHAIRMAN MRCHT - VIDEO SHOWING BEACH RE - <br />NOURISHMENT (DREDGING) ON ST. AUGUSTINE BEACH <br />Chairman Macht recently had been on the beach at St Augustine and took videos of <br />the sand dredging project underway there. He narrated the video and described the dredging <br />November 2, 1999 <br />50 <br />