My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/16/1999
CBCC
>
Meetings
>
1990's
>
1999
>
11/16/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:58 PM
Creation date
6/17/2015 10:21:35 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/16/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As brown m Exhibit A4 of the attached agreement, the estimated cost sharing between the Developer and <br />the County for ova -sizing of the sewage lift station to serve the developer's property and smmmdmg <br />properties fionting 41- Street <br />Description <br />Developers Share (0) <br />C urty's Share <br />Total <br />Al — 8 -inch Force Main <br />$11,730.99 <br />$80,49028 <br />$92,22127 <br />A2 —12 inch Water Main <br />$8,368.65 <br />$116,380.74 <br />$124,749.39 <br />A3 — 16 -inch Water Main <br />$19,827.45 <br />$695,593.45 <br />$715,420.90 <br />Total Cost <br />$39,927.09 <br />5892,464.47 5932,39156 <br />(0) Developer's Share is besea upon appucaole lore exc =uu coaq;m ati 6 ,,,I -I ..Ulu Yl Al l.ufu. avl <br />515.77/ft. for sewer pmsoaot to Resolution 99-58. <br />Reimbursement Method for Lift Station Over-sizinz <br />Board mithorization is requested to recover connection fees from benefiting property owners for <br />construction of said lift station pursuant to the provisions of Section 201.11, Code of Indian River Courcy, for <br />fiords advanced by the COUNTY to construct the sewage lift station. <br />Board mWwrization is requested to reimburse the COUNTY forthe cost incurred for the over -sizing of the <br />lift station. The fiords to reimburse the COUNTY for oversh* of the lift station shall come fiom distributing <br />the project cost ofthe lift station over -sizing against the benefiting Property Panels identified in EAM A-5 as <br />Panels A, B, C acrd D. The mimbrnsement fee to be imposed on each benefiting Property Panel (A, B, C & <br />D) shall be based on each Panel's hydraulic share of the lift station. <br />Reimbursement Method for Water Mum and Force Mains: <br />The Developer will be reimbursed for mon based on payment of water and sewer capacity charges <br />and connection fees. <br />Construction of the water main and fD= main will allow the County m coordinate expansion of the water <br />distribution and wastewater collection system with development of the site and adjacent properties. The <br />County's share will be fimded fiom the capacity charge fee fiord. (See below for account number.) <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the Board of County Commissioners <br />approve the attar Developer's agreement as presented, and authorize the Chamnsn to coc ute the same. <br />ACCOUNT NO: 4724000.169-370.00 NAME: Utility Capacity Charge Fund AMOUNT: $892,464.47 <br />NOVEMBER 16, 1999 <br />-151- 8 o o K i I I u-UF4',`,"-':d <br />
The URL can be used to link to this page
Your browser does not support the video tag.