Laserfiche WebLink
r� ��sa <br />BOOT( III FA�t <br />AGREEMENT FOR TRANSPORTATION, TREATMENT AND DISPOSAL OF <br />DOMESTIC WASTEWATER RESIDUAL IS ON= <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />11.H.3. WOODMERE TRADE CENTER FORCE MAIN AND <br />WATER MAIN CONSTRUCTION - DEVELOPER'S AGREEMENT <br />WITH JOHN LLOYD <br />The Board reviewed a Memorandum of November 27, 1999: <br />DATE: NOVEMBER 27,1999 <br />TO: <br />JAMES E. CHANDLER <br />Developer's Share(*) <br />COUNTY ADMQVISTRATOR <br />FROM: <br />DONALD R HUBB , PE p <br />Tocol Cost <br />DIRECTOR OF S 'g <br />PREPARED <br />STEVEN J. DOYLE, P.E. <br />AND STAFFED <br />CAPTTAL PROJECTS MANAG <br />BY: <br />SUBJECT: DEVELOPER'S AGREEMENT FOR WOODMERE TRADE CENTER <br />FORCEMAIN & WATER MAIN CONSTRUC nON <br />BACKGROUND <br />Woodmen: Trade Center is proposed commercial development locked at the northeast comer of Nigh <br />Street and Woodmen: Road, just south of C.R.-512. A 6 -inch foreemain and an 84nc h water main is planned <br />along Nigh Street to Woodmen Road to serve current establishmems and fugue developments along High <br />Street and Woodmere Road. In addition, the County Public Works Deparhnent has schedule a roadway <br />resur&cing project along Woodmere Road and it would be advantageous to have the necessary utilities in place <br />prior to the final road resur6cing. <br />The water main shall be constructed along the east side of High Street, then east along Woodmen Road <br />(north side) to Old Dixie Highway. The fon amain shall be constructed along the west side of High Street, then <br />east along woodmen Road (south side) to old Dixie Highway. <br />The property owner / Developer, John Lloyd, has agreed to enter into a cost sharing agreement with the <br />County to construct the proposed fticemain and water main in conjunction with their site development. <br />Attached is a proposed Developer's Agreement with John Lloyd for reimbursement of a portion of the <br />subject fonxmain and water line. <br />ANALYSIS <br />As shown in Exhibit B of the attached Agreement, the estimated cost sharing between the Developer and <br />the County is as follows: <br />Description <br />Water Distribution & Wastewater Collection System <br />Developer's Share(*) <br />$5,674.20 <br />County's Shan <br />$42,809.68 <br />Tocol Cost <br />$48,483.88 <br />(') Developer's share is based upon applicable line extension charges at a minknim of $1125la for water and S15.77/R for sewer <br />pursuant to Resolution 94-58. <br />December 7, 1999 <br />98 <br />