My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/14/1999
CBCC
>
Meetings
>
1990's
>
1999
>
12/14/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:59 PM
Creation date
6/17/2015 10:24:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/14/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: DECEMBER 6,1999 <br />TO JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM DONALD R. HUBBS, .E <br />DIRECTOR OF UTII.TIY S hI <br />PREPARED STEVEN J. DOYLE, P.E. "� <br />AND STAFFED CAPITAL PROJECTS MANAGER <br />BY: <br />SUBJECT: DEVELOPER'S AGREEMENT FOR POINTE WEST DEVELOPMENT <br />MASTER PLANNED FORCE MAIN & WATER MAIN CONSTRUCTION <br />BACKGROUND <br />Pointe West of Vero Beach is a proposed development in the vicinity of 746 Avenue and 12th Street, <br />south of State Road 60 and west of Kings Highway. A 124nch Master Plan waterline, a 204nch Master <br />Plan waterline and a 16 -inch Master Plan Faroe main is scheduled for construction along the Developer's <br />property. <br />Pointe West of Vero Beach, Florida Limited Partnership (General Partner by Charles R. Mechling, <br />President and Thomas R. Jonas, Secretary) has agreed to enter into a cost sharing agreement with the County <br />to construct the master planned watedines and force mains m cenjuacdon with their site development. <br />Attached is a proposed developer's agreement with Pointe Wast of Vero Beach, Florida Limited Partnership <br />for reimbursement of a portion ofthe subject water lines and wastewater lines. A description ofthe proposed <br />Master Plan lines is pry below and discussed in further detail in the Developer's Agmemeu. <br />A 746 Avenue from SR -0 to 166 St. COUNTY MASTER PLAN Water Line: <br />Furnish and insmll a 124nch PVC water main along 746 Ave. from SR -W to 166 St=tt. Make <br />connection to an eadeng 124nch water line located on 746 Ave. approximately 350 lineal feet <br />south of SR -60. The new water line shall extend south along 746 Ave. to 166 St near the NE <br />Comer of the DEVELOPER's property for a total of 2,400 +/- lineal feet. <br />B 166 Strut COUNTY MASTER PLAN Water Line• <br />Furnish and install a 204nch PVC water main along 166 St. from 82od Ave. to 746 Avenue and <br />from 746 Ave. to the eastern most property line of the DEVELOPER'S property. Total footage <br />is approximately 9,200+/- linear feet. The DEVELOPER shall make connection to the water line <br />referenced under item A, above. <br />C, 746 Avenue to 86 St COUNTY MASTER PLAN Wastewater Form Main: <br />Furnish and instil a 164nch PVC form main along 746 Ave. Make connection to an existing <br />12 -inch force main located on 746 Ave. near the intersection of Rosewood Road (approximately <br />2,600 lined feat south of SR -60). The new force main shall extend south along 746 Ave. to 86 <br />St. (approximately 5,2001ionai feet). <br />D 86 Street COUNTY MASTER PLAN Wastewater Form Main: <br />Furnish and instil a 16 -inch PVC force main along a St from the intersection of 746 Ave. to <br />8V Avenue. The DEVELOPER shall make connection to the force main referenced under item <br />C. above. This section of fora main along 86 St. is approximately 5,200 +/- lineal fat in length. <br />As shown in Exhibit C-1 ofthe attached agreement, the estanated cost sharing between the Developer and <br />the County for an 12 -inch water main along 74th Ave from SR -60 to 82°d Avenue Street is pmented in the <br />Agreement and summarized below: <br />DECEMBER 14, 1999 <br />-82- <br />
The URL can be used to link to this page
Your browser does not support the video tag.