My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/1/2000
CBCC
>
Meetings
>
2000's
>
2000
>
2/1/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 1:18:09 PM
Creation date
6/16/2015 4:10:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/01/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />DESCRIPTION AND CONDITIONS <br />Following Hurricanes Floyd and Irene, the County was awarded <br />disaster relief funds to mitigate the damage caused by these <br />storms. Funds included emergency dune restoration work for 1.8 <br />miles of County shoreline. To complete the work the following <br />services are recommended: <br />1. Beach Profile Surveys <br />Pre -construction and post -construction Surveys are <br />necessary for each site.- $ 8.125.00 <br />2. Technical Services <br />Prepare engineering drawings for permit and construction <br />documents. $ 6.780.00 <br />TOTAL (not to exceed) $ 14.905.00 <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends approval of the requested services. Through the <br />disaster relief funding agreement, these services are eligible for <br />up to 87.55 reimbursement of the cost. Services to be provided by <br />Morgan & Eklund Surveyors, Wabasso, F1. Funding will be from the <br />Beach Restoration Fund. <br />Authorization for execution of emergency purchase order is also <br />required. <br />ATTR <br />Cost estimate from Morgan & Eklund Surveyors, Inc. <br />The Commissioners congratulated Coastal Engineer Jeffrey Tabar on the recent birth <br />of his son, Joshua Thomas. <br />ON MOTION by Commissioner Ginn, SECONDED BY <br />Commissioner Stanbridge, the Board unanimously approved the <br />beach profile surveys and technical services to be provided by <br />Morgan & Eklund Surveyors, Inc., in an aggregate amount not <br />to exceed $14,905.00, with funding from the Beach Restoration <br />February 1, 2000 <br />61 <br />'9 <br />BOOK 2 FAGS <br />r. <br />
The URL can be used to link to this page
Your browser does not support the video tag.