My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/2/2000
CBCC
>
Meetings
>
2000's
>
2000
>
5/2/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:18 PM
Creation date
6/16/2015 4:04:18 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/02/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction of the Phase II -C project area has been completed. On March 28, 2000 clearance was <br />received from the Department of Environmental Protection, allowing connections to begin, in the Phase <br />II -C project area. Owners have been notified and connections have begun. We are now ready to proceed <br />with Phases II -D and II -E (Combined). <br />ANALYSIS <br />Design of the water distribution system is complete. Approval of the attached Resolution III will confirm <br />and approve the preliminary assessment <br />On April 17, and April 20, 2000 at 7:00 pm., informational meetings were held in the North County <br />Library, for the benefit of the property owners. Within the Phase II -D & II -E project area, North from <br />Wimbrow Dr, including Main Street, there are 1,661 lots, approximately 913 homes, 6 churches and the <br />City of Sebastian complex, to benefit from this project Typical platted lot sizes are .25 acre, plus or <br />minus. In addition to serving the City of Sebastian Municipal Complex, this project will provide potable <br />water and fire protection to an area noted for failing well systems. <br />More effective management of project construction, inspections, cash flows, and interaction with property <br />owners is being accomplished by having divided Phases II and III into smaller projects. This may enable <br />more utility construction contractors to bid on these projects possibly malting the bid process more <br />competitive. The attached map displays the area to benefit from the assessment projects, as divided into <br />parts A, B, C, D & E, for Phase II (Exhibit 3). Phases II -D & II -E are being combined to adhere with <br />scheduling agreed upon with the City of Sebastian and to complete the remainder of Phase II (North of <br />CR 512). The City of Sebastian is waiting for the completion of the water line installation in order to <br />complete road and drainage improvements, and comply with time constraints relating to the bond issue <br />financing these improvements. <br />Project No. <br />Lots <br />Parcel Y.D. Nos. <br />Locations <br />II -A UW -96 -20 -DS <br />479 <br />448 <br />West of Roseland Road <br />II -B UW -97 -11 -DS <br />758 <br />714 <br />East of Roseland Rd South of Vocelle Ave. <br />11-C UW -97 -12 -DS <br />562 <br />525 <br />North of Vocelle Ave. along Layport Dr. <br />II -D UW -97 -13 -DS <br />636 <br />614 <br />North of Layport Dr, West of Fleming St. <br />II -E UW -97 -14 -DS <br />1,025 <br />912 <br />East of Fleming St, Main St. to Louisiana Ave. <br />Total <br />3,461 <br />3,213 <br />Engineering design has been completed by the staff of the Department of Utility Services for Phases II -D <br />and II -E. We are now ready to begin the assessment process associated with this project, as outlined <br />herein. Summary assessment rolls for Phases II -D & II -E are attached (Exhibit 4). The full assessment <br />rolls are on file in the commission office. This project is to be paid through the assessment of property <br />owners along the proposed water line route. Financing will be from the assessment fund 473, account <br />numbers 473400-169-356.00 and 473-000-169-357.00. If needed, inter -find borrowing will be available <br />from the capacity fee find 472. The estimated project cost and amount to be assessed for Phases II -D & <br />II -E is S 3,515,740.52 (rounded) (Exhibit -5). The estimated cost per square foot is SLI94416 (rounded). <br />The actual assessed cost, as with any project will be determined based on actual competitive bid prices. <br />On March 24, 2000, a letter was sent to the City Manager, of the City of Sebastian, with a copy of a draft <br />agenda item and a map of the project area (Exhibit 6). <br />May 2, 2000 <br />65 <br />BOOK iIJ PAGE 4 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.