My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/2/2000
CBCC
>
Meetings
>
2000's
>
2000
>
5/2/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:18 PM
Creation date
6/16/2015 4:04:18 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/02/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g00Kcy f'AGE <br />to Barth, the second bidder. Barth's references came up fairly good and they have performed <br />work for the County in the past. He had notified Adnan of the recommendation. Adnan's <br />attorney had contacted Mr. Kafer and was advised of the reference checks. The attorney was <br />present and wished to be heard. <br />Vice Chairman Ginn was displeased to have received additional backup at the last <br />minute because it is difficult to read the documents during a meeting. She had read part of <br />it and, according to a letter from Summit Construction, it looked like some of the bids did <br />not contain all of the proper documentation and they have requested the County Attorney to <br />review the entire process. She asked Director Davis for his opinion. <br />Director Davis advised that Summit's complaint was that an acknowledgment of the <br />third addendum was not submitted with Barth's bid. Staff has considered that but the County <br />has the right to accept the bid that is in the best interest of the County. Staff feels the <br />acknowledgment came a little later than the bid date, but the County should not pay $7,000 <br />more to the third bidder simply because the acknowledgment was not submitted with the bid. <br />In response to Vice Chairman Ginn, Mr. Wer advised that the third addendum is <br />basically clarification of the plans and specifications. <br />To clarify, Chairman Adams understood that Adnan (the first bidder) had an incorrect <br />total, and Barth (the second bidder) had not submitted the acknowledgment of the third <br />addendum. Summit was saying their bid was complete and should be considered because <br />they followed all the rules. <br />Both Vice Chairman Ginn and Commissioner Stanbridge wanted to table the matter <br />until they had time to read the information and think it through. <br />Chairman Adams inquired if the Board would hear the Adnan attorney if he wished <br />to speak, and the Commissioners agreed they would. <br />Jonathan Ferguson, attorney with Gonano, Harrell, and Ferguson, 1600 S. Federal <br />May 2, 2000 <br />82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.