My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/13/2000
CBCC
>
Meetings
>
2000's
>
2000
>
6/13/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:18 PM
Creation date
6/16/2015 4:08:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.H.3. EAGLE TRACE SUBDIVISION - FORCE MAIN <br />CONSTRUCTION - DEVELOPER'S AGREEMENT WITH <br />NATIONAL REHAB PROPERTIES, INC. <br />The Board reviewed a Memorandum of June 1, 2000: <br />DATE: JUNE 1. 2000 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: DONALD R HUBBS. P. <br />DIRECTOR OF UTILITY Sl <br />�59e <br />PREPARED MICHAEL C. HOTCHKISS, P.E. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILrrY SERVICES <br />SUBJECT: DEVELOPER'S AGREEMENT FOR EAGLE TRACE SUBDIVISION <br />FORCE MAIN CONSTRUCTION <br />BACKGROUND <br />Eagle Trace Subdivision is a proposed 63 lot single-family home residential development located at <br />the northeast comer of 61" Street and 5e Avenue. A master planned force main is scheduled to be <br />constructed from the Central Region Wastewater Treatment Facility on an as -needed basis driven by <br />development (see attached copy of master plan map). The force main installation will comprise <br />constructing approximately 1,200 linear feet of 6" PVC, 5,530 linear feet of 8" PVC and 2,650 linear <br />feet of 12" PVC along the 58' Avenue right-of-ways, and 5,400 linear feet of 6" PVC along the 491e <br />Street right-of-way, from the Central Regional Wastewater Treatment Plant to the northwest corner of <br />the project NATIONAL REHAB PROPERTIES, INC., has agreed to enter into a cost sharing <br />agreement with the County to construct the master planned force main in conjunction with their site <br />development <br />Attached is a proposed developer's agreement with NATIONAL REHAB PROPERTIES, INC. for <br />reimbursement of a portion of the subject force main. The Developer's Agreement is stipulated to <br />reimburse the Developer for the County's share of the force main based on itemized invoices of <br />installed materials on a percentage complete basis less 101/6 retainage, monthly with final payment <br />and release of retainage at the time said facilities are dedicated to the County (SC — LA of attached <br />agreement). Developer will be required to post a 225% payment and performance bond prior to <br />issuance of Utility Construction Permit (SC — 14 of attached agreement). <br />JUNE 139 2000 <br />-55- BOOK CAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.