My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/20/2000
CBCC
>
Meetings
>
2000's
>
2000
>
6/20/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 8:46:17 AM
Creation date
6/9/2015 1:19:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/20/2000
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />BACKGROUND <br />Citrus Springs is a proposed development located near the northeast comer of 584' Ave. and 5* Street <br />SW. Refer to Exhibit -A. A 16 -inch Master Plan Water Main is scheduled for construction along the <br />Developer's property. The 16 -inch Master Plan water main is slated for construction on an "as -needed" basis <br />driven by development. The proposed 6-mch force main provides an extension of the wastewater collection <br />system to serve the proposed development, surrounding residentmL future development and has the ability to <br />loop the County's South Regional and West Regional Wastewater Collection Systems. The County's <br />Wastewater Collection System is comprised of five independent regional service areas (North, South, <br />Central, West Regional and Sea Oaks WWTFs) which geographically make up the Countywide Wastewater <br />Collection Systems. <br />Extending a force main along 5d' SW from a force main on 58'h Ave. to a force main on 43`d Ave. would <br />hydraulically interconnect the County's South and West Regional Service Areas. Just as looping of water <br />mains in a distribution system. the effects of looping a force main provides a similar level of redundancy and <br />hydraulic balancing of flows. The 6 -inch force extension / looping has the ability to divert a portion of the <br />sewage flow to either the West Regional or South Regional Wastewater Collection Systems for Tn atrnent <br />and Disposal. Until this opportunity, each of the regional wastewater collection areas had not expanded <br />sufficiently to allow for the interconnection of the regional collection areas. <br />The Sun Tree Partners Inc. have agreed to enter into a cost sharing agreement with the County to <br />construct the Coumv Master Plan Water Main and the proposed Force Main Extension / Looping System in <br />conjunction with their site development. <br />Attached is a proposed Developer's Agreement with Sun Tree Partners Inc. for reimbursement of a <br />portion of the subject waterlines and wastewater lines (Refer to Exhibit -B). A description of the proposed <br />Master Plan line and Force Main Looping System is presented below and discussed in further detail in the <br />Developers Agreement. <br />A COUNTY MASTER PLAN 16 -inch Water Main along 5`� Street SW from 58' Ave. to 43`d Ave.: <br />Furnish and install a 16 -inch water main along 5' Street SW from Icings Highway (584i Ave.) <br />east to 43r4 Avenue. Make connection to an existing 16 -inch water line located on 43rd Avenue. <br />The proposed 16 -inch water main shall extend approximately 5,453 +/- lineal feet. <br />B FORCE MAIN EXTENSION/LOOP — 6 -inch Force Main along 5`h Street SW from 58`h Ave to <br />43`° Ave.: <br />Furnish and install a 6 -inch force main along 5d' Street SW from Icings Highway (581, Ave.) east <br />to 43r4 Avenue. Make connection to a future 6 -inch force main to be located on 43' Avenue. <br />The proposed 6 -inch force main for this DEVELOPMENT shall extend approximately 5,453 +/- <br />lineal feet to 43rd Ave. <br />The DEVELOPER shall make connection to a proposed 6 -inch force main to be constructed <br />along 43'd Ave. by another Developer known as Arbor Trace. Refer to Exbibit-D. <br />Staff is currently negotiating with the owners of Arbor Trace to over -size their required force <br />main along 43'd Ave. to handle the projected sewage flows from the proposed Citrus Springs <br />Development as well as the surrounding community. Staff will be bringing a proposed Arbor <br />Trace Developer's Agreement to the Board in the near future. <br />ANALYSIS <br />As shown in Exhibit C-1 of the attached agreement. the estimated cost sharing between the Developer <br />and the County for a 16 -inch County Master Plan Water Main along 5" Street SW from 58`b Ave. to 43"' Ave. <br />is presented in the Agreement and summarized below: <br />As shown in F.zhibit C -Z of the attached agreement, the estimated cost sharing between the Developer <br />and the Countv for an 6 -inch County Force Main Extension / Loop along 5`h St. SW from the 58`h Ave to 43rd <br />Ave. is presented in the Agreement and summarized below: <br />June 20, 2000 <br />103 <br />BOOK iv_ -L <br />C, <br />
The URL can be used to link to this page
Your browser does not support the video tag.