My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/18/2000
CBCC
>
Meetings
>
2000's
>
2000
>
7/18/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:19 PM
Creation date
6/16/2015 3:42:38 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/18/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ibis authorization is in cm*mnance with the conditions of the current Masteller & Moler. Inc. contract <br />with the Public Works Department dated January 21, 1997. The original authorization for professional services <br />provided for Specifically, Section M A.21 of the Contract Authorization authorizes the County Utilities <br />Department to eruer into an Age vitt the consultant in the event relocation of County Utilities facilities <br />design services are raltured. <br />The scope of Services for Professional Services has been fiuther expanded to included the design, <br />permitting and construction services for the installation of a 12 -inch diameter Master Plan Force Main along CR - <br />510, south along 58* Ave. then east along Tie Street to the County s North Regional Wastewater Treatment <br />Facility (W WTF). The County's current North Regional Wastewater Collection System consist of a single force <br />main along CR -512 which heads east to US Highway #1 and thea south along US Highway #1 to the Carry's <br />North Regional WWTF. The need to expand the wastewater collection system is prompted by development and <br />hydraulic over loading of the existing wastewater collection mains. The County's long range pig dtort plan <br />is to construct an additional force main along CR -5 10, which will allow for looping of the wastewater collection <br />systsm and permit future development along CR -510. This will further reduce the hydraulic overloading of the <br />existing force main along the US Hrghway # I corridor. <br />The Scope of Services for the professional work to be perfumed is attached herewith as Exhibit B as <br />described in Masteller & Moler, Inc.'s proposal dated J»ce 2, 2000, Addendum #3 in the total amount of <br />$136,950.00. <br />RECOMMENDED ACTION <br />The.staff of the Department of Utility Services recommends that the Board of County Commissioners <br />authorize the attached Contract for engineering and permitting services in the amount of $136,950.00 and <br />authorize the Chairman to execute same, as presented. <br />LIST OF EXHIBITS: <br />Exhibit A. Excerpt from Previous Board of County Commission Agenda dated January 21, 1997 <br />Exhibit B. Excerpt front Work Authorizations dated June 2, 2000, fi>nn Masteller & Moler, Inc. <br />Exhibit C. Sketch of Proposed Force Main alang CR -510,5e Ave. & 77th Street <br />ACCOUNT INFORMATION: <br />July 18, 2000 <br />OSI <br />R ! 4 PG 303 <br />I <br />Descripti <br />Account No. <br />Account Name <br />Amount <br />Phase M. <br />Relocation of Existing Water Main <br />471-000-169-398.00 <br />Repairand Replacement <br />$22.900.00 <br />aloe CR -512 <br />Phase IV. <br />Water Main Extension under CR- <br />Y:7L000-169400.00 <br />Capacity Charge Fund <br />$12.600.00 <br />512 for Future Developments <br />Phase ID. <br />Relocation of Existing Force Main <br />471-000-169-399.00 <br />Repair and Replacement <br />$19.800.00 <br />aloe CR -512 <br />Force Main Extension along CR - <br />Phase III. <br />510 to 58th Ave. to 77th Street to <br />`/'Z-000-169-419.00 <br />Capacity Charge Fund <br />$81.650.00 <br />the North WWTF <br />TOTAL <br />$136.950.00 <br />July 18, 2000 <br />OSI <br />R ! 4 PG 303 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.