Laserfiche WebLink
• <br />DATE: JULY 18, 2000 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: DONALD R. HUBBS. P.E. <br />DIRECTOR OF UTILITY <br />PREPARED STEVEN J. DOYLE. P.E. <br />AND STAFFED CAPITAL PROJECTS MANAGER Ir <br />BY: <br />SUBJECT: DEVELOPER'S AGREEMENT <br />ORANGE ISLAND. L.L.C. (FOR 45TH STREET DESIGN CENTER) <br />PROPOSED FORCE MAIN ALONG 45TH ST. FROM OLD DIXIE HWY TO 45TH <br />ST. DESIGN CENTER <br />BACKGROUND <br />The 45TH Street Design Center is a proposed 3.46 -acre development (40.000 square foot commercial <br />bldg.) located at the south side of 45th Street. just east of US Highway ill in Vero Beach. The Developer of <br />the 45Th Street Design Center has made application to the Utility to make connection to water and sewer. <br />The Developer has an access to an existing gravity sewer located on US Highway #I approximately 600 <br />lineal feet south of the intersection with 45 Street. To discharge to the gravity sewer on US Highwav #1. <br />the Developer must install a duplex grinder pumping system and a force main that would terminate in the <br />sanitary manhole. <br />The existing gravity sewer along US #1 is not adequate to handle all potential sewage which could be <br />generated from the 45th Street commercial corridor. The minor sewage flow generated from the 45" Street <br />Design Center could discharge to the gravity system but that does not solve any future potential growth <br />along 45Th Street. The ultimate solution is to expand the County's wastewater collection system (force <br />main) on Old Dixie Highway and extend the force main system to the east side of US Highway # 1. <br />In lieu of discharging to the sanitary manhole. Staff has negotiated with the Developer whom has <br />agreed to contribute funds toward a 8 -inch force main that would not only serve their immediate needs but <br />also future growth needs from adjoining undeveloped commercial parcels along 45' Street. <br />Therefore it is proposed that the County extend a force main along 45th Street, across US Highway # 1 <br />and make connection to an existing force main on Old Dixie Highway. Exhibit -A shows a vicinity map of <br />the 45Th Street corridor along with the proposed force main improvement. <br />ANALYSIS <br />As shown in Exhibit -B of the attached Agreement. the estimated cost sharing between the Developer <br />and the County is as follows: <br />Description Wastewater Collection Svstem Total <br />Developer's Share(*) $17.676.09 S17.676.09 <br />County's Share $55.133.91 $55.133.91 i <br />Total Cost $72.810.00 572.810.00 <br />(•) Developer's share is based upon applicable line extension charges at a minimum of S15.77/ft. for sewer pursuant to <br />Resolution 99-58 plus an additional contribution of S 11.100.00 <br />August 1, 2000 <br />95 <br />• <br />