Laserfiche WebLink
BACKGROUND <br />On September 7, 1999, the Indian River County Board of County Commissioners unanimously <br />authorized staff to proceed with the design engineering necessary, in order to proceed with the <br />above project. Design has been completed by the Department of Utility Services staff. We are now <br />ready to begin the assessment process associated with this project (See attached EXHIBIT 1 - <br />agenda item and minutes of the above referenced meeting, -EXHIBIT 2- Plat Map and EXHIBIT 3 - <br />Estimated Project Cost). <br />ANALYSIS <br />There are 6 non- platted residential lots, which may benefit from this proposed water line on 28' <br />Avenue. The petition has been signed by four of the owners (67%). The properties are from 0.23 <br />acre to 0.42 of an acre. Due to lake and wetland areas, which reduce the usable land areas, staff has <br />made adjustments to the square footages proposed for assessment, to the 4 properties along the west <br />side and north of 28'b Avenue. The attached map displays the area to benefit from the assessment <br />project The 2 lots abutting 4th Street were provided service in the Phase I Water Project, which <br />was completed on January 12, 1993 and are not included. ( see attached EXHIBIT 2- Plat Map). <br />Indian River County's Comprehensive Plan states, "The County's water system shall be expanded <br />to supply the potable water needs of the eastern half of the County during the period 1986- <br />2005."(See attached EXHIBIT 5, page 4 of the Potable Water Sub -element, and page 22 of the <br />Sanitary Sewer Sub -element). This project is to be paid through the assessment of property owners <br />along the proposed water line route. In the interim, funding will be from the Assessment Fund No. <br />473-000-169-372.00. <br />Twenty Eighth Avenue is a private street, and the owners have provided the County with the <br />necessary utility easement <br />Attached are Resolutions I and II for the assessment project The total estimated project cost and <br />amount to be assessed, including engineering and administration is S 18,795.00. The estimated cost <br />per square foot is S 0.256861 (rounded),(See attached EXHIBIT 4 -Assessment Roll). <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the Board of County <br />Commissioners approve the attached resolutions, which approve the preliminary assessment roll <br />and establish the public hearing date. <br />LIST OF EXMBITS: <br />1 -BCC minutes Sept7,1999 <br />2 -Plat Map <br />3 -Estimated Project Cost <br />4 -Preliminary Assessment Roll <br />5 -Page 4 Potable Water Sub -element <br />August 1, 2000 <br />83 <br />B 114 PG 423 <br />