Laserfiche WebLink
• Board of County Commissioners Consideration <br />The Board of County Commissioners is to approve, approve with conditions, or deny the special <br />exception use request. Pursuant to Section 971.05 of the LDRs, the Board of County Commissioners <br />is to consider the appropriateness of the requested use for the subject site and surrounding area. The <br />county may attach any conditions and safeguards necessary to mitigate impacts and to ensure <br />compatibility of the use with the surrounding area. <br />• planning and Zoning Commission Action <br />At its regular meeting of July 13, 2000, the Planning and Zoning Commission voted unanimously <br />to recommend that the Board of County Commissioners approve the special exception'use with the <br />condition that staff re-evaluate the design of the recreation path along the north side of 8" Street. <br />Planning staff has coordinated with Traffic Engineering staff and concluded that the existing design <br />remains the safest alternative. Staff has not included this condition in the recommendation that <br />appears at the end of this report. At its July 13' meeting, the Planning and Zoning Commission also <br />approved the request for major site plan approval contingent on the Board of County Commissioners <br />approving the special exception use. <br />ANALYSIS: <br />Zoning ning Classification: RS -6, Residential Single Family (up to 6 units per acre) <br />2. Land Use Designation: L-2, Low Density (up to 6 units per acre) <br />3. Surrounding Land Use & Zoning: <br />North: Single Family Residences/RS-6 <br />South: 8th Street, Residences/RS-6 <br />East: Vacant, (Chase Meadows SD)/RS-6 <br />West: Commercial, Vacant/CH. RS -6 <br />4. Total Area of Development: 114,840 sq. ft. or 2.64 acres <br />5. Building Area: 2,400 sq. ft. <br />6. Impervious Surface: 10,609 sq. ft. (an additional 12.958 sq. ft. of semi - <br />impervious surface is proposed) <br />7. Semi -Impervious Surface: 12,958 sq. ft. (stabilized parking area) <br />8. Open Space: Required: 40.0% <br />Proposed: 79.5% <br />9. Traffic Circulation: The site will be accessed by a full movement, two-way driveway <br />connection to 811 Street. This paved driveway connection to 8' Street will connect to a one- <br />way circular drive that accesses a drop-off area on the south side (front) of the building. A <br />one-way drive will continue around the east side of the building to provide access to parking <br />spaces along the rear of the building and connect with a two-way driving aisle. An additional <br />two-way stabilized driveway extends to the west of the paved circular drive along the west <br />property line to provide access to stabilized parking spaces located to the west of the <br />proposed church. The proposed traffic circulation plan and project traffic impact statement <br />have been approved by the Traffic Engineering Department. No off-siie traffic <br />improvements are required in conjunction with this development, and none are proposed. <br />AUGUST 8, 2000 <br />-36- 0 <br />