Laserfiche WebLink
• <br />FINAL COST FOR: <br />18TH AVENUE BETWEEN 1 ST PLACE AND 2ND STREET <br />DATE: August 15, 2000 <br />TOTAL F.F. 846.00 <br />PROJECT NO. 9606 <br />FINAL• COST <br />TOTAL L.F. 432.13 <br />CONSTRUCTION <br />Labor <br />$7,060.23 <br />Outside Labor <br />$133.04 <br />Equipment <br />$5,311.03 <br />Equipment Rental <br />$75.87 <br />Asphalt <br />$2,269.12 <br />Concrete <br />$85.96 <br />Sod <br />$2,098.80 <br />Pipe/Culverts <br />$923.66 <br />Stabilizer& Limerock <br />$1,649.53 <br />Engineering Tests <br />$56.55 <br />Miscellaneous <br />$6.50 <br />TOTAL CONSTRUCTION COSTS: <br />$19,670.29 $19,670.29 <br />p MIT <br />$350.00 $350.00 <br />TITLE SEARCH FEES <br />($2.59 /L.F.) $2.59 x 432.13 <br />$1,119.21 $1.119.21 <br />Sub -Total $21,139.50 <br />Administration 3.005227% $635.29 <br />Recording Fees $88.50 <br />TOTAL $21,863.29 <br />25% County's Cost $5,465.82 <br />75% Property Owner's Assessment $16,397.47 <br />2% Collection Fee (75% Figure) $327.95 <br />TOTAL COST TO PROPERTY OWNERS: $16,725.42 $16,725.42 <br />Assessment= $16,725.42 = $19.77 <br />846 FF <br />9606FCST.WK4 <br />OCTOBER 10, 2000 <br />-53- <br />09/29/2000 <br />