Laserfiche WebLink
F, <br />FINAL COST FOR: <br />1 ST STREET BETWEEN 16TH AVENUE AND 18TH AVENUE <br />DATE: August 15, 2000 <br />TOTAL F.F. 919.10 <br />PROJECT NO. 9721 <br />TOTAL L.F. 506.71 <br />FINAL COST <br />CONSTRUCTION <br />Labor <br />$8,545.95 <br />Outside Labor <br />$161.04 <br />Equipment <br />$6,428.64 <br />Equipment Rental <br />$91.83 <br />Asphalt <br />$2,746.61 <br />Concrete <br />$104.04 <br />Sod <br />$2,540.46 <br />Pipe/Culverts <br />$1,118.05 <br />—Stabilizer& Limerock <br />$1,996.64 <br />Engineering Tests <br />$68.45 <br />Miscellaneous <br />$7.86 <br />TOTAL CONSTRUCTION COSTS: <br />$23,809.57 $23,809.57 <br />PERMIT FEES <br />$350.00 $350.00 <br />ENGINEERING <br />($2.59 /L.F.) $2.59 x 506.71 $1,312.38 <br />Administration 2.999613% <br />Recording Fees <br />$1,312.38 <br />Sub -Total $25,471.95 <br />$764.06 <br />$87.50 <br />TOTAL $26,323.51 <br />25% County's Cost $6,580.88 <br />75% Property Owner's Assessment $19,742.63 <br />2% Collection Fee (75% Figure) $394.85 <br />TOTAL COST TO PROPERTY OWNERS: $20,137.49 $20,137.49 <br />Assessment = S20,137,49 = $21.91 <br />919.1 FF <br />9721 FCST.WK4 <br />ocTo� �052��04 5 7 <br />09/29/2000 <br />