Laserfiche WebLink
• <br />0 <br />I <br />n <br />y <br />FINAL ASSESSMENT ROLL <br />FOR PAVING AND DRAINAGE IMPROVEMENTS <br />--t� <br />TO: 1ST STREET FROM 16TH AVENUE TO 18TH AVENUE <br />�7Ft <br />TOTAL FRONT FEET.......... <br />919.1 i <br />COST TO PROPERTY OWNERS. <br />$20,137.49 <br />G -)w I <br />PROJECT NO, 9721 <br />COST PER FRONT FOOT.... <br />$21.91 <br />b <br />FRONT <br />NAME & ADDRESS <br />LEGAL DESCRIPTION <br />FOOTAGE COST/F.F. <br />TOTAL COST <br />* 6. Larry R. & Lucy Kline <br />14-33-39-0001740004-00003.0 <br />100.00 $21.91 <br />$2,191.00 <br />16261st Street <br />Lot 3, Block D, Moreland S/D <br />Vero Beach, Florida 32962 <br />PBI 4-12, OR Book 444, PP 594 <br />* 7. William W. & Janice K. Smith <br />14-33-39-00017-0004-00004.0 <br />265.20 $21.91 <br />$5,810.54 <br />13018th Avenue <br />The Moreland S/D, Lot 4, Bl. D, LESS Ely 100 <br />Vero Beach, Florida 32962 <br />feet & also LESS the following described <br />parcel: Beg at SE cor of Lot 6, S 61.13 ft <br />N <br />more or less to edge of water of an existing <br />lake as, shown on said plat, th meander Wly <br />along edge of water to a point, said point being <br />53.0 ft more or less S of SW cor of Lot 6, th N <br />to SW cor of Lot 6 th along S line to POB, <br />LESS that portion of Lot 4, Bl. D being more <br />particularly described as follows: Beg at the <br />found 4" x 4" concrete monument marking <br />the SW cor of said Lot 5 <br />* = SIGNED PETITION <br />919.10 $21.91 <br />$20,137.49 <br />+ <br />TOTAL FRONT COST PER F.F. SAL ASSESSMENT <br />FOOTAGE <br />9721FIN.WK4 <br />C <br />2 �! �A s 09/25/2000© + <br />tel sbI <br />