<br />Engineering design hasbeen coin IIM-19
<br />P Y Dep lty -A We are
<br />now ready to begin the assessment process associated with this project, as outlined herein. A summary assessment
<br />roll for Phase M -A is attached (Exhibit 4). The full assessment roll is on file in the commission office. This
<br />project is to be paid through the assessment of property owners along the proposed water line route. Financing will
<br />be from the assessment.fim
<br />d 473, account number 473-000-169-489. If needed, inter -fund borrowing will be
<br />available from the capacity fee fund 472. The estimated project cost and amount to be assessed for Phase III -A is
<br />$ 1,856,564.20 (rounded) (Exhibit -5). The estimated cost per square foot is $0.202375 (rounded). The actual
<br />assessed cost, as with any project will be determined based on actual competitive bid prices.
<br />�
<br />_ PHASF•ODTEIOIa6R•
<br />S'OUTAWESTOFBARBER•STREPih
<br />III -A UW -97 -16 -DS 861 773 / 384~• South of Caravan Terrace with Periwinkle Drive
<br />along the South & West
<br />III -B UW -97 -17 -DS 540 476 / 230 East of Laconia St.& West of Shakespear St..
<br />Between Crystal Mist & Lanfair Ave's
<br />111-C UW -97 -18 -DS 900 822 / 402 Between Laconia & Barber St's , between Bayfront
<br />Terrace and Rolling Hills (Lansdowne)
<br />III -D UW -97 -19 -DS 698 639 / 232 East of Laconia St., between Clearmont & Capon
<br />Streets.
<br />III -E UW -97 -20 -DS 735 654 / 276 West of Laconia St, between Granduer & Gladiola
<br />Avenue's
<br />Total 3,734 3,364 /1,524 South of CR 512 and SW of Barber Street
<br />leted b the staff of flee artment of Uti i
<br />On September 25, 2000, a letter was sent to the City Manager, of the City of Sebastian, with a copy of a draft
<br />agenda item and a map of the project area (Exhibit 6).
<br />RECOMMENDATION
<br />The staff of the Department of Utility Services recommends that the Board of County Commissioners approve the
<br />attached Resolutions III.
<br />LIST OF EXHIBrrS•
<br />1 -October 3, 2000 MgAa r tatim 4 -Estimated Project cost
<br />2 -Map of Project area 5 -Letter to City of Sebastian
<br />3 -Summary assessment roll
<br />Utilities Director Don Hubbs commented that Phase II ofthe project had been broken
<br />into 5 segments, A through E, and supplied water to 2,186 lots through 229,000 feet of
<br />water line. All the phases of the project have been done in house, both the design and
<br />construction, using staff members. Phase III involves 3,734 lots and 40 miles of pipe. An
<br />informational meeting regarding Phase III was held on October 12' at the North County
<br />Library.
<br />OCTOJJ 1'1520 0 7
<br />-36-
<br />0 0
<br />-1
<br />Services for Phase III
<br />Engineering design hasbeen coin IIM-19
<br />P Y Dep lty -A We are
<br />now ready to begin the assessment process associated with this project, as outlined herein. A summary assessment
<br />roll for Phase M -A is attached (Exhibit 4). The full assessment roll is on file in the commission office. This
<br />project is to be paid through the assessment of property owners along the proposed water line route. Financing will
<br />be from the assessment.fim
<br />d 473, account number 473-000-169-489. If needed, inter -fund borrowing will be
<br />available from the capacity fee fund 472. The estimated project cost and amount to be assessed for Phase III -A is
<br />$ 1,856,564.20 (rounded) (Exhibit -5). The estimated cost per square foot is $0.202375 (rounded). The actual
<br />assessed cost, as with any project will be determined based on actual competitive bid prices.
<br />�
<br />_ PHASF•ODTEIOIa6R•
<br />S'OUTAWESTOFBARBER•STREPih
<br />III -A UW -97 -16 -DS 861 773 / 384~• South of Caravan Terrace with Periwinkle Drive
<br />along the South & West
<br />III -B UW -97 -17 -DS 540 476 / 230 East of Laconia St.& West of Shakespear St..
<br />Between Crystal Mist & Lanfair Ave's
<br />111-C UW -97 -18 -DS 900 822 / 402 Between Laconia & Barber St's , between Bayfront
<br />Terrace and Rolling Hills (Lansdowne)
<br />III -D UW -97 -19 -DS 698 639 / 232 East of Laconia St., between Clearmont & Capon
<br />Streets.
<br />III -E UW -97 -20 -DS 735 654 / 276 West of Laconia St, between Granduer & Gladiola
<br />Avenue's
<br />Total 3,734 3,364 /1,524 South of CR 512 and SW of Barber Street
<br />leted b the staff of flee artment of Uti i
<br />On September 25, 2000, a letter was sent to the City Manager, of the City of Sebastian, with a copy of a draft
<br />agenda item and a map of the project area (Exhibit 6).
<br />RECOMMENDATION
<br />The staff of the Department of Utility Services recommends that the Board of County Commissioners approve the
<br />attached Resolutions III.
<br />LIST OF EXHIBrrS•
<br />1 -October 3, 2000 MgAa r tatim 4 -Estimated Project cost
<br />2 -Map of Project area 5 -Letter to City of Sebastian
<br />3 -Summary assessment roll
<br />Utilities Director Don Hubbs commented that Phase II ofthe project had been broken
<br />into 5 segments, A through E, and supplied water to 2,186 lots through 229,000 feet of
<br />water line. All the phases of the project have been done in house, both the design and
<br />construction, using staff members. Phase III involves 3,734 lots and 40 miles of pipe. An
<br />informational meeting regarding Phase III was held on October 12' at the North County
<br />Library.
<br />OCTOJJ 1'1520 0 7
<br />-36-
<br />0 0
<br />-1
<br />
|