My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/17/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/17/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 4:21:33 PM
Creation date
7/14/2015 9:57:08 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/17/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Statutes: <br />334.044(7) <br />850-035-01 <br />PAVEMENT MANAGEMENT <br />OGC - 02/15 <br />Page 8 of 22 <br />6. The Recipient shall permit, and shall require its contractors and subcontractors to permit, <br />the Department's authorized representatives to inspect all work, materials, payrolls, and <br />records, and to audit the books, records, and accounts pertaining to the financing and <br />development of the Project. <br />7. The Recipient must certify that the consultant has been selected in accordance with the <br />Consultants' Competitive Negotiation Act (Section 287.055, Florida Statutes). Contractor <br />must be prequalified by the Department pursuant to Section 337.14, Florida Statutes, and <br />Rule Chapter 14-22, Florida Administrative Code for projects meeting the thresholds <br />therein. <br />8. In the event the Recipient proceeds with the design, construction and construction <br />engineering inspection services ("CEI") of the Project with its own forces, the Recipient will <br />only be reimbursed for direct costs (this excludes general and administrative overhead). <br />The Recipient shall hire a Department qualified CEI. The Department shall have the right, <br />but not the obligation, to perform independent testing from time to time during the course <br />of construction of the Project. . <br />9. Upon completion of the work in accord with the Plans, the Recipient shall furnish a set of <br />"as -built" plans certified by the Engineer of Record/CEI that the necessary improvements have <br />been completed in accordance with the Plans as the same may be modified in accord with the <br />terms of this Agreement. Additionally, the Recipient shall assure that all post construction <br />survey monumentation required by Fla. Stat. is completed and evidence of such is provided <br />to the Department in a manner acceptable to the Department. <br />10. The Recipient shall allow public access to all documents, papers, letters, or other material <br />subject to the provisions of Chapter 119, Florida Statutes, and made or received by the <br />Recipient in conjunction with this Agreement. Specifically, if the Recipient is acting on behalf <br />of a public agency the Recipient shall: <br />a. Keep and maintain public records that ordinarily and necessarily would be required <br />by the Department in order to perform the services being performed by the <br />Recipient. <br />b. Provide the public with access to public records on the same terms and conditions that <br />the Department would provide the records and at a cost that does not exceed the cost <br />provided in chapter 119, Florida Statutes, or as otherwise provided by law. <br />c. Ensure that public records that are exempt or confidential and exempt from public <br />records disclosure requirements are not disclosed except as authorized by law. <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.