My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-087A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-087A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 10:04:25 AM
Creation date
7/22/2015 9:58:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/05/2015
Control Number
2015-087A
Agenda Item Number
8.N.
Entity Name
Guettler Brothers Construction
Subject
Intersection Improvements
Area
Aviation Boulevard / 20th Avenue
Project Number
1422
Bid Number
2014049
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and <br />guarantees. <br />SC -14.07 Final Payment <br />SC -14.07.C.1. Delete paragraph GC -14.07.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to the " Local <br />Government Prompt Payment Act" , Florida Statutes section 218.70, et. seq. <br />SC -15.01 OWNER May Suspend Work <br />SC -15.01.A Delete the last sentence in paragraph GC -15.01.A and insert the following in its <br />place: <br />CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any <br />such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br />10.05. CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br />CONTRACTOR shall not be paid on account of Toss of anticipated profits or revenue or other eco- <br />nomic loss arising out of or resulting from such Work suspension. <br />SC -15.02 OWNER May Terminate For Cause <br />SC -15.02.A.5 and SC -15.02.A.6 Add the following new paragraphs immediately after <br />paragraph GC -15.02.A.4: <br />5. CONTRACTOR's violation of Section 02225 — "Erosion Control and Treatment of <br />Dewatering Water From the Construction Site." <br />6. CONTRACTOR's failure to make payment to Subcontractors or Suppliers for <br />materials or labor in accordance with the respective agreements between the <br />CONTRACTOR and the Subcontractors or Suppliers. <br />SC -15.04 CONTRACTOR May Stop Work or Terminate <br />SC -15.04 Delete the following text from the first sentence of paragraph GC -15.04.A: <br />di A <br />SC -15.04 Delete the following text from the second sentence of paragraph GC -15.04.A: <br />SC -16 DISPUTE RESOLUTION <br />SC -16.02 Mediation <br />SC -16 Add the following new paragraph immediately after paragraph GC -16.01. <br />SC -16.02 Mediation <br />00800-10 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 10F:\Public Works\ENGINEERING DIVISION PROJECTS\1422 Aviation Blvd -20th Avenue Intersection Improvements \Admim\bid documents\Master Contract <br />Documents\00800 - Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.