My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-087A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-087A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 10:04:25 AM
Creation date
7/22/2015 9:58:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/05/2015
Control Number
2015-087A
Agenda Item Number
8.N.
Entity Name
Guettler Brothers Construction
Subject
Intersection Improvements
Area
Aviation Boulevard / 20th Avenue
Project Number
1422
Bid Number
2014049
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATIONS: <br />1. The ITEMIZED BID SCHEDULE, Section 310, pages 00310-3 through 00310-5 has been revised to <br />add the following bid item: <br />Item No. <br />Description <br />Unit Quantity <br />***663-3-11 <br />FIBER OPTIC SPLICE ENCLOSURE <br />EA <br />1 <br />2. Plan Sheet No. 27 (Signalization Plan) shows "SIGNAL DISPLAY DETAILS (INITIAL)" at top of page. <br />This is deleted. Also, under NOTES: Number 1. "The traffic signal shall initially be installed as a <br />flashing beacon with 1 -section, 1 -way, traffic signal heads" is deleted. (No revised plan is <br />provided.) <br />QUESTIONS AND RESPONSES: <br />QUESTION NO. 1 <br />The Signalization Plans and Tabulation of Quantities describe pay item (630-2-11) as "Conduit (F & I) <br />Underground 2" PVC." The signalization plans show (2) direction bore shots across the intersection. <br />Direction Bore Conduit has a different pay item. Will this be changed and added as a separate item? <br />Additionally, the specifications dictate that the underground conduit is to be paid as a "Linear Foot (LF)" <br />of conduit. The plans show and quantity it as "Trench Foot." Will this be changed? <br />ANSWER NO. 1 <br />All conduit is to be direct bury. There is not intended to be any directional bore. Conduit quantity is <br />based upon trench length, not conduit length, as identified. <br />QUESTION NO. 2 <br />Internally Illuminated Signs are not specified in the plans or specifications as being LED. Indian River <br />County typically utilizes LED. Will this be changed? <br />ANSWER NO. 2 <br />Internally Illuminated Street Name Signs are specified within the Indian River County Traffic Signal <br />Specifications, Sheet 30, note A.7 and on Sheet 27 the Street Name Signs are identified to be internally <br />illuminated. Also, Internally Illuminated Street Signs must be with LED lighting, <br />ATTACHMENT: <br />Revised ITEMIZED BID SCHEDULE, Section 310, page 00310-3 through 00310-5, dated September 12, 2014 <br />Page 2 of 3 <br />F :,_iu Nok,\ENCENT_'E P.NG PPv1SR)N PROJECTsIIe23 Aviation Blvdnt;. Avcnut iatersccticn [mFre catcets Ad mrt;Addc idu,n:Adder.curn <br />
The URL can be used to link to this page
Your browser does not support the video tag.