Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Guettler Brothers Construction, LLC/ <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The project includes the widening of Aviation Boulevard at 20th Avenue with turn lanes. The <br />work will provide for roadway construction to include asphalt milling, asphalt placement, base, <br />stabilized subgrade, drainage improvements, curb and gutter installation, signing and <br />pavement markings. The project will also include a traffic signal at the intersection. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Aviation Boulevard/20th Avenue Intersection Improvements <br />County Project Number: 1422 <br />Bid Number: 2014049 <br />Project Address: Aviation Boulevard/20th Avenue Intersection, Vero Beach, <br />Florida 32960 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 180th day after the date when <br />the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />00520 - Agreement (Public Works) REV 06-14 <br />00520 - 2 <br />B: \2013-2014 FY (2014000)\2014049 Aviation Blvd and 20th Ave Intersection\00520 - Agreement (Public Works) REV 06-14.doc <br />