My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-087A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-087A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 10:04:25 AM
Creation date
7/22/2015 9:58:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/05/2015
Control Number
2015-087A
Agenda Item Number
8.N.
Entity Name
Guettler Brothers Construction
Subject
Intersection Improvements
Area
Aviation Boulevard / 20th Avenue
Project Number
1422
Bid Number
2014049
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR. <br />Project No • 1427 <br />Project Description: Aviation Boulevard/20th Street Intersection Improvements <br />OWNER's Bid No. 2014049 <br />CONTRACT FOR: Aviation Boulevard/20th Street Intersection <br />(Insert Name of Contract as it appears in the Bid Documents) <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To• <br />OWNER <br />And To. <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within days <br />of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630 - 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1422 Aviation Blvd -20th Avenue Intersection Improvements\Admim\bid documents\Master Contract Documents\00630 - <br />Certificate of Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.