My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-101
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2015 9:14:50 AM
Creation date
7/23/2015 12:24:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/19/2015
Control Number
2015-101
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates
Subject
Water Plant SCADA System
Assessment Remediation Plan
Area
North Hobart WTP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t.!'f 1HC1jt ,"O" 1 r T . <br /> AGE <br /> i.R.SMITH.CLERK <br /> Exhibit A <br /> Work Order#4 <br /> Indian River County Department of Utility Services <br /> Water Plant SCADA System Assessment and Remediation Plan <br /> and North WTP Clearwell &Chlorine Panel Design &Improvements <br /> Engineering Services <br /> PROJECT UNDERSTANDING <br /> An evaluation of the existing PLC hardware and supervisory computer and data <br /> acquisition (SCADA) system was conducted in early 2015,of which outlined <br /> numerous upgrades and improvements that are needed. The purpose of the study <br /> was to evaluate the existing outdated SCADA system and provide <br /> recommendations for upgrades and an approach with actions for IRCU to <br /> implement. The recommended work provided a prioritized and phased format to <br /> allow IRCU to address these important issues in a logical order which will help <br /> minimize disruptions in to the water treatment plant's (WTP) operations. <br /> The following scope outlines the first several phases recommended in the report, <br /> consisting of remediation and assessment of both the North and South water plant <br /> SCADA systems, and modifying the PLC and replacing the chlorine and clearwell <br /> panel at the North Hobart WTP. <br /> SCOPE OF WORK <br /> Consultant will utilize the services and provide coordination of Control Systems <br /> Design,Inc.,and C&W Engineering in the execution of these tasks. <br /> TASK 1—REMEDIATION AND ASSESSMENT (NORTH and SOUTH WTP) <br /> Consultant will review each control panel at the North and South WTP, and <br /> prepare specific tasks/controls that will be interrupted and agree upon an initial <br /> approach as to whether the system has to be temporarily run with additional <br /> equipment or can be run in local manual. Consultant will review the data and <br /> operations that shall be maintained and archived without interruption. <br /> For the control panels with remote telemetry,Consultant will detail the specific <br /> connectivity that is to be removed, updated and/or can be interrupted and agree <br /> upon an approach as to how long the plant can run without this communications. <br /> Consultant will evaluate status, communications and pathing for all remote sites. <br /> IC:\WPB,_Civi1\044572031 IRCU SCADA StudylScope\IRCU Water Plant SCADA Report-Modified.docx Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.