My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-061A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2016 9:33:39 AM
Creation date
5/16/2016 9:33:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/19/2016
Control Number
2016-061A
Agenda Item Number
8.G.
Entity Name
Harn R/O Systems
Subject
North Hobart Water Treatment Plant
Membrane Replacement
Area
7751 58th Ave.
Bid Number
2016-025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> I <br /> I <br /> Agreement <br /> Bid No. 2016025 <br /> North Hobart Water Treatment Plant Membrane Replacement 3 <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) Ham R/O Systems, Inc. (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree ! <br /> as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents <br /> as set forth in Article 8 of this Agreement. The Work is generally described as follows i <br /> Contractor as an independent contractor and not as an employee shall furnish and complete all <br /> of the necessary labor, material and equipment to perform the work as specified or indicated in <br /> the Contract Documents and per FDEP, and the Indian River County Department of Utility 3 <br /> Services standards. The work is generally described as follows- <br /> i <br /> The scope of work includes all work necessary to; replace existing membrane elements, including <br /> removal and disposal of membrane elements, cleaning/swabbing the existing pressure vessels, <br /> installation of new membrane elements, replacement of existing permeate hoses with PVC piping, <br /> relocation of sample tubing, bacteriological testing, and startup and testing of new membranes <br /> with existing Owner provided membrane system equipment. Work in this section shall be the x <br /> responsibility of a reverse osmosis (RO) membrane system integrator (OEM), including supervision ! <br /> and direction. The work is to be performed at the North Hobart Water Treatment Plant. i <br /> v <br /> i <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be generally described <br /> as follows: <br /> s <br /> Project Name North Hobart Water Treatment Plant Membrane Replacement <br /> Bid Number: 2016-025 <br /> Project Address: 7751 58th Avenue, Vero Beach, FL 32967. I <br /> ARTICLE 3—TERM AND CONTRACT TIMES <br /> 3.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> Section 00530-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.