My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-061A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2016 9:33:39 AM
Creation date
5/16/2016 9:33:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/19/2016
Control Number
2016-061A
Agenda Item Number
8.G.
Entity Name
Harn R/O Systems
Subject
North Hobart Water Treatment Plant
Membrane Replacement
Area
7751 58th Ave.
Bid Number
2016-025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> C CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br /> Regulations that may affect cost, progress, and performance of the Work. <br /> D CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> done so) all additional or supplementary examinations, investigations, explorations, tests, <br /> studies, and data concerning conditions (surface, subsurface, and Underground Facilities) <br /> at or contiguous to the Site which may affect cost, progress, or performance of the Work or <br /> which relate to any aspect of the means, methods, techniques, sequences, and procedures s <br /> of construction to be employed by CONTRACTOR, including applying the specific means, <br /> methods,techniques, sequences, and procedures of construction, if any, expressly required <br /> by the Contract Documents to be employed by CONTRACTOR, and safety precautions and <br /> programs incident thereto. <br /> E. CONTRACTOR does not consider that any further examinations, investigations, <br /> explorations, tests, studies, or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times, and in accordance with the other terms and <br /> conditions of the Contract Documents. <br /> F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents. <br /> t <br /> G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br /> observations obtained from visits to the Site, reports and drawings identified in the Contract <br /> Documents, and all additional examinations, investigations, explorations,tests, studies, and <br /> data with the Contract Documents. <br /> H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or <br /> discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br /> written resolution thereof by OWNER is acceptable to CONTRACTOR. <br /> I. The Contract Documents are generally sufficient to indicate and convey understanding of ; <br /> all terms and conditions for performance and furnishing of the Work. <br /> 4 <br /> ARTICLE 8 - CONTRACT DOCUMENTS a <br /> 8.01 The Contract Documents consist of the following. _ <br /> { <br /> A. This Agreement <br /> 1 <br /> r <br /> B Certificates of Liability and Workers Compensation Insurance <br /> i <br /> _ <br /> e <br /> C. Invitation to Bid 2016-025 <br /> i <br /> D. Addenda (numbers 1 to 1 , inclusive); <br /> i <br /> E. CONTRACTOR'S Bid Form Section 00310 <br /> F. Bid Bond <br /> G. 00431 Schedule of Subcontractors <br /> Section 00530-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.