Laserfiche WebLink
inspections, tests, and approvals that the results <br />certified indicate compliance with, the Contract <br />Documents. <br />E. The limitations upon authority and responsibil- <br />ity set forth in this paragraph 9.10 shall also apply to <br />ENGINEER's Consultants, Resident Project Repre- <br />sentative, and assistants. <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br />10.01 Authorized Changes in the Work <br />A. Without invalidating the Agreement and <br />without notice to any surety, OWNER may, at any time <br />or from time to time, order additions, deletions, or <br />revisions in the Work by a Written Amendment, a <br />Change Order, or a Work Change Directive. Upon <br />receipt of any such document, CONTRACTOR shall <br />promptly proceed with the Work involved which will be <br />performed under the applicable conditions of the <br />Contract Documents (except as otherwise specifically <br />provided). <br />B. If OWNER and CONTRACTOR are unable to <br />agree on entitlement to, or on the amount or extent, if <br />any, of an adjustment in the Contract Price or Contract <br />Times, or both, that should be allowed as a result of a <br />Work Change Directive, a Claim may be made <br />therefor as provided in paragraph 10.05. <br />10.02 Unauthorized Changes in the Work <br />A. CONTRACTOR shall not be entitled to an <br />increase in the Contract Price or an extension of the <br />Contract Times with respect to any work performed <br />that is not required by the Contract Documents as <br />amended, modified, or supplemented as provided in <br />paragraph 3.04, except in the case of an emergency <br />as provided in paragraph 6.16 or in the case of <br />uncovering Work as provided in paragraph 13.04.B. <br />10.03 Execution of Change Orders <br />A. OWNER and CONTRACTOR shall execute <br />appropriate Change Orders recommended by ENGI- <br />NEER (or Written Amendments) covering: <br />1. changes in the Work which are: (i) <br />ordered by OWNER pursuant to paragraph <br />10.01.A, (ii) required because of acceptance of <br />defective Work under paragraph 13.08.A or <br />OWNER's correction of defective Work under <br />paragraph 13.09, or (iii) agreed to by the <br />parties; <br />2. changes in the Contract Price or <br />Contract Times which are agreed to by the <br />parties, including any undisputed sum or <br />amount of time for Work actually performed in <br />accordance with a Work Change Directive; and <br />3. changes in the Contract Price or <br />Contract Times which embody the substance of <br />any written decision rendered by ENGINEER <br />pursuant to paragraph 10.05; provided that, in <br />lieu of executing any such Change Order, an <br />appeal may be taken from any such decision in <br />accordance with the provisions of the Contract <br />Documents and applicable Laws and Regula- <br />tions, but during any such appeal, <br />CONTRACTOR shall carry on the Work and <br />adhere to the progress schedule as provided in <br />paragraph 6.18.A. <br />10.04 Notification to Surety <br />A. If notice of any change affecting the general <br />scope of the Work or the provisions of the Contract <br />Documents (including, but not limited to, Contract <br />Price or Contract Times) is required by the provisions <br />of any Bond to be given to a surety, the giving of any <br />such notice will be CONTRACTOR's responsibility. <br />The amount of each applicable Bond will be adjusted <br />to reflect the effect of any such change. <br />00700 - General Conditions REV 5-10-13 <br />00700 - 30 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1413-Martin Luther King Walking Trail \Admin\bid documents\Master Contract Documents \ 00700 - General Conditions REV 5-10- <br />13.doc <br />