inspections, tests, or approvals and shall cooperate
<br />with inspection and testing personnel to facilitate
<br />required inspections or tests.
<br />B. OWNER shall employ and pay for the
<br />cervices of an independent testing laboratory to
<br />perform all inspections, tests, or approvals required by
<br />the Contract Documents except:
<br />1. for inspections, tests, or approvals
<br />below;
<br />e. -- -- -•e -'-'
<br />2. that costs incurred in connection with
<br />tests or inspections conducted pursuant to
<br />paragraph 13.04.B shall be paid as provided in
<br />3. as otherwise specifically provided in
<br />the Contract Documents.
<br />C. If Laws or Regulations of any public body
<br />having jurisdiction require any Work (or part thereof)
<br />specifically to be inspected, tested, or approved by an
<br />employee or other representative of such public body,
<br />CONTRACTOR shall assume full responsibility for
<br />arranging and obtaining such inspections, tests, or
<br />approvals, pay all costs in connection therewith, and
<br />furnish ENGINEER the required certificates of inspec-
<br />tion or approval.
<br />D. CONTRACTOR shall be responsible for
<br />arranging and obtaining and shall pay all costs in
<br />connection with any inspections, tests, or approvals
<br />required for OWNER's and ENGINEER's acceptance
<br />of materials or equipment to be incorporated in the
<br />Work; or acceptance of materials, mix designs, or
<br />equipment submitted for approval prior to
<br />CONTRACTOR's purchase thereof for incorporation
<br />in the Work. Such inspections, tests, or approvals
<br />shall be performed by organizations acceptable to
<br />OWNER and ENGINEER.
<br />E. If any Work (or the work of others) that is to
<br />be inspected, tested, or approved is covered by CON-
<br />TRACTOR without written concurrence of ENGI-
<br />NEER, it must, if requested by ENGINEER, be uncov-
<br />ered for observation.
<br />F. Uncovering Work as provided in paragraph
<br />13.03.E shall be at CONTRACTOR's expense unless
<br />CONTRACTOR has given ENGINEER timely notice
<br />of CONTRACTOR's intention to cover the same and
<br />ENGINEER has not acted with reasonable prompt-
<br />ness in response to such notice.
<br />13.04 Uncovering Work
<br />A. If any Work is covered contrary to the written
<br />request of ENGINEER, it must, if requested by ENGI-
<br />NEER, be uncovered for ENGINEER's observation
<br />and replaced at CONTRACTOR's expense.
<br />B. If ENGINEER considers it necessary or
<br />advisable that covered Work be observed by ENGI-
<br />NEER or inspected or tested by others, CONTRAC-
<br />TOR, at ENGINEER's request, shall uncover, expose,
<br />or otherwise make available for observation, inspec-
<br />tion, or testing as ENGINEER may require, that
<br />portion of the Work in question, furnishing all neces-
<br />sary labor, material, and equipment. If it is found that
<br />such Work is defective, CONTRACTOR shall pay all
<br />Claims, costs, losses, and damages (including but not
<br />limited to all fees and charges of engineers, architects,
<br />attorneys, and other professionals and all court or
<br />arbitration or other dispute resolution costs) arising out
<br />of or relating to such uncovering, exposure, observa-
<br />tion, inspection, and testing, and of satisfactory
<br />replacement or reconstruction (including but not
<br />limited to all costs of repair or replacement of work of
<br />others); and OWNER shall be entitled to an
<br />appropriate decrease in the Contract Price. If the
<br />parties are unable to agree as to the amount thereof,
<br />OWNER may make a Claim therefor as provided in
<br />paragraph 10.05. If, however, such Work is not found
<br />to be defective, CONTRACTOR shall be allowed an
<br />increase in the Contract Price or an extension of the
<br />Contract Times (or Milestones), or both, directly
<br />attributable to such uncovering, exposure,
<br />observation, inspection, testing, replacement, and
<br />reconstruction. If the parties are unable to agree as to
<br />the amount or extent thereof, CONTRACTOR may
<br />make a Claim therefor as provided in paragraph
<br />10.05.
<br />13.05 OWNER May Stop the Work
<br />A. If the Work is defective, or CONTRACTOR
<br />thqupentreet—Doeuments, OWNER may order CON
<br />-
<br />Until the cause for such order has been eliminated;
<br />however, this right of OWNER to stop the Work shall
<br />exercise this right for the benefit of CONTRACTOR,
<br />any Subcontractor, any Supplier, any other individual
<br />or entity, or any surety for, or employee or agent of
<br />any of them.
<br />00700 - General Conditions REV 5-10-13
<br />00700 - 36
<br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1413-Martin Luther King Walking TraiMdmin\bid documents\Master Contract Documents \00700 - General Conditions REV 5-10-
<br />13.doc
<br />
|