My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: Martin Luther King Walking Trail <br />Project No. 1413 <br />Bid No. 2015034 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />Q Unit Prices <br />❑ Lump Sum <br />D Other: <br />❑ By Change Order: <br />Q Contractor's Records <br />Q Engineer's Records <br />Q Other: <br />❑ By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />By: <br />RECOMMENDED: <br />By: <br />APPROVED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />ENGINEER (Signature) <br />Date: <br />OWNER (Signature) <br />Date: <br />* * END OF SECTION * <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\Admin\bid documents\Master <br />Contract Documents\00948 - Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.