Laserfiche WebLink
SECTION 01050 <br />FIELD ENGINEERING AND LAYOUT <br />1.1 GENERAL <br />A. The CONTRACTOR will furnish all construction staking for the project. All <br />staking from control will be under the supervision of a Florida Registered Land <br />Surveyor. <br />B. Develop and make all detail surveys and measurements needed for <br />construction including but not limited to, slope stakes, batter boards, piling <br />layouts and all other working lines, elevations and cut sheets. <br />C. Keep a transit and leveling instrument on the site at all times and a skilled <br />instrument man available whenever necessary for layout of the Work. <br />D. Provide all material required for benchmarks, control points, batter boards, <br />grade stakes, and other items. <br />E. Be solely responsible for all locations, dimensions and levels. No data other <br />than written orders of the ENGINEER shall justify departure from the <br />dimensions and levels required by the Drawings. <br />F. Safeguard all points, stakes, grademarks, monuments and benchmarks made <br />or established on the Work, and reestablish same, if disturbed. Rectify all <br />Work improperly installed because of not maintaining, not protecting or <br />removing without authorization such established points, stakes, marks and <br />monuments. <br />G. When requested by the ENGINEER, provide such facilities and assistance as <br />may be necessary for the ENGINEER to check line and grade points placed by <br />the CONTRACTOR. Do no excavation or embankment work until all <br />cross -sectioning necessary for determining pay quantities has been completed <br />and checked by the ENGINEER. <br />H. The cost of performing engineering and layout work described above shall be <br />included in the contract unit prices for the various items of work to which it is <br />incidental. No separate payment will be made for surveying or engineering. <br />1.2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br />A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the <br />accuracy of all survey and existing site information as indicated in the Contract <br />Documents. Immediately notify the ENGINEER upon discovery of any errors, <br />inaccuracies or omissions in the survey data. The commencing of any of the <br />work by the CONTRACTOR shall be held as the CONTRACTOR's acceptance <br />that all survey or existing site information is correct and accurate, without any <br />reasonably inferable errors, inaccuracies or omissions. <br />1050-1 01050 Field Engineering <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1413-Martin Luther King Walking Trail\Admin\bid documents\Master Contract Documents\01050 - Field <br />Engineering.doc <br />