01340 — Submittal of Shop Drawings <br />M. Upon return of a submittal marked "Revise and Resubmit", make the <br />corrections indicated and repeat the initial approval procedure. The "Not <br />Approved" notation is used to indicate material or equipment that is not <br />acceptable. Upon return of a submittal so marked, repeat the initial <br />approval procedure utilizing acceptable material or equipment. <br />N. Any related Work performed or equipment installed without an "Approved" <br />or "Approved as Corrected" Shop Drawing will be at the sole responsibility <br />of the CONTRACTOR. <br />O. Submit Shop Drawings well in advance of the need for the material or <br />equipment for construction and with ample allowance for the time required <br />to make delivery of material or equipment after data covering such is <br />approved. CONTRACTOR shall assume the risk for all materials or <br />equipment which is fabricated or delivered prior to the approval of Shop <br />Drawings. Materials or equipment will not be included in periodic progress <br />payments until approval thereof has been obtained in the specified <br />manner. <br />P. ENGINEER will review and process all submittals promptly, but a <br />reasonable time should be allowed for this, for the Shop Drawings being <br />revised and resubmitted, and for time required to return the approved <br />Shop Drawings to CONTRACTOR. <br />Q. Furnish required submittals with complete information and accuracy in <br />order to achieve required approval of an item within three submittals. All <br />costs to ENGINEER involved with subsequent submittals of Shop <br />Drawings, Samples or other items requiring approval, will be back -charged <br />to CONTRACTOR in accordance with the General Conditions and the <br />Supplementary Conditions. If the CONTRACTOR requests a substitution <br />for a previously approved item, all of ENGINEER'S costs in the reviewing <br />and approval of the substitution will be back -charged to CONTRACTOR <br />unless the need for such substitution is beyond the control of <br />CONTRACTOR. <br />+ + END OF SECTION + + <br />01340 - Submittal of Shop Drawings <br />01340-6 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\Admin\bid documents\Master Contract <br />Documents\01340 - Submittal of Shop Drawings.doc <br />