My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01550 <br />ACCESS ROADS, PARKING AREAS <br />AND USE OF PUBLIC STREETS <br />1.1 GENERAL <br />A. Provide all temporary construction roads, walks and parking areas required <br />during construction and for use of emergency vehicles. Design and maintain <br />temporary roads and parking areas so they are fully usable in all weather <br />conditions. <br />B. Prevent interference with traffic and the OWNER's operations on existing roads. <br />Indemnify and save harmless the OWNER from any expenses caused by <br />CONTRACTOR's operations over these roads. <br />C. Roadways damaged by CONTRACTOR shall be restored to their original <br />condition by the CONTRACTOR subject to approval of the OWNER or <br />ENGINEER. <br />D. Remove temporary roads, walks and parking areas prior to final acceptance and <br />return the ground to its original condition, unless otherwise required by the <br />Contract Documents. <br />1.2 USE OF PUBLIC STREETS <br />The use of public streets and alleys shall be such as to provide a minimum of <br />inconvenience to the public and to other traffic. Any earth or other excavated <br />material spilled from trucks shall be removed immediately by the CONTRACTOR <br />and the streets cleaned to the satisfaction of the Owner. <br />1.3 USE OF PUBLIC STREETS FOR HAUL ROADS <br />A. Prior to construction, the CONTRACTOR shall designate all proposed haul <br />roads to be used during the life of the project. Any earth or other materials <br />spilled from trucks shall be removed by the CONTRACTOR and streets <br />cleaned to the satisfaction of the Owner. He further shall be responsible for <br />repairs to any damages caused by his operations, prior to final payment. <br />B. All trucks carrying earth shall be covered while moving with an appropriate <br />tarpaulin. Should trucks hauling earth fail to cover their loads, the <br />CONTRACTOR will be given two (2) written warnings, after which the <br />CONTRACTOR shall pay a fine of $50 per uncovered truck to the Owner <br />when invoked by the Owner to Owner's Engineer. All cleanup shall be the <br />responsibility of the CONTRACTOR. <br />C. All trucks/moving equipment shall have backup warning horns in proper <br />working order while on the job site. <br />+ + END OF SECTION + + <br />01550 Access Roads <br />01550-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1413-Martin Luther King Walking Trail\Admin\bid documents\Master Contract <br />Documents\01550 - Access Roads.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.