Laserfiche WebLink
SECTION 01710 <br />SITE CLEANUP AND RESTORATION <br />1.1 SCOPE <br />Furnish all labor, equipment, appliances, and materials required or necessary to <br />clean up and restore the site after the construction is completed. <br />1.2 REQUIREMENTS <br />A. During the progress of the project, keep the work and the adjacent areas <br />affected thereby in a neat and orderly condition. Remove all rubbish, <br />surplus materials, and unused construction equipment. Repair all <br />damage so that the public and property owners will be inconvenienced as <br />little as possible. <br />B. Provide onsite containers for the collection of waste materials, debris, and <br />rubbish and empty such containers in a legal manner when they become <br />full. <br />C. Where material or debris has been deposited in watercourses, ditches, <br />gutters, drains, or catch -basins as a result of the CONTRACTOR's <br />operations, such material or debris shall be entirely removed and <br />satisfactorily disposed of during the progress of the work, and the ditches, <br />channels, drains, etc., shall be kept clean and open at all times. <br />D. Before the completion of the project, unless otherwise especially directed <br />or permitted in writing: <br />1. Tear down and remove all temporary buildings and structures; <br />2. Remove all temporary works, tools, and machinery, or other <br />construction equipment furnished; <br />3. Remove all rubbish from any grounds occupied; and <br />4. Leave the roads, all parts of the premises, and adjacent property <br />affected by construction operations, in a neat and satisfactory <br />condition. <br />E. Restore or replace any public or private property damaged by construction <br />work, equipment, or employees, to a condition at least equal to that <br />existing immediately prior to the beginning of the operations. To this end, <br />the CONTRACTOR shall restore all highway, roadside, and landscaping <br />work within any right-of-way, platted or prescriptive. Acceptable materials, <br />equipment, and methods shall be used for such restoration. <br />F Thoroughly clean all materials and equipment installed and on completion <br />of the work, deliver the facilities undamaged and in fresh and new - <br />appearing condition. <br />01710 Site Cleanup <br />01710-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking TrailWdmin\bid documents\Master Contract Documents101710 <br />- Site Cleanup.doc <br />