My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required by its <br />manufacturer or the OWNER, until the system is no longer needed. If a water <br />quality violation occurs, immediately cease all work contributing to the water quality <br />violation and correct the problem. <br />E. Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to <br />the Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR INSTALLATION, AND MAINTENANCE <br />A. State Certified Erosion Control Specialty Subcontractor is Required for Installation <br />and Maintenance: Installation and maintenance of all erosion and stormwater <br />pollution control devices, shall be by a State Certified erosion control subcontractor <br />who specializes in the installation and maintenance of such devices. After <br />installation, this specialty subcontractor shall maintain the erosion and stormwater <br />pollution control devices until in the ENGINEER's sole opinion, the devices are no <br />longer necessary (such time not to extend past the date the OWNER formally <br />accepts the project as complete). Before beginning construction, submit to Indian <br />River County for review and approval, a Stormwater Pollution Prevention Plan <br />(SWPPP), prepared by the certified erosion control subcontractor. Construction <br />shall not begin until the SWPPP has been approved by Indian River County. <br />Submit the approved SWPPP to the ENGINEER before beginning construction. <br />Include in the SWPPP, the "Contractor's Affidavit Regarding Erosion Control and <br />Treatment of Dewatering Water and Stormwater From the Construction Site" <br />(located at the end of this Section). <br />1.6 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS <br />DEFINED <br />A. With respect to this Section and as may be further defined in paragraphs 1.6.B, <br />1.6.C, and 1.6.D, "pollution" is the presence in off-site waters of any substances, <br />contaminants, or manmade or human -induced impairment of off-site waters or <br />01025-6 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1413-Martin Luther King Walking Trail\Admin\bid documents\Master Contract <br />Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.