Laserfiche WebLink
D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required by its <br />manufacturer or the OWNER, until the system is no longer needed. If a water <br />quality violation occurs, immediately cease all work contributing to the water quality <br />violation and correct the problem. <br />E. Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to <br />the Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR INSTALLATION, AND MAINTENANCE <br />A. State Certified Erosion Control Specialty Subcontractor is Required for Installation <br />and Maintenance: Installation and maintenance of all erosion and stormwater <br />pollution control devices, shall be by a State Certified erosion control subcontractor <br />who specializes in the installation and maintenance of such devices. After <br />installation, this specialty subcontractor shall maintain the erosion and stormwater <br />pollution control devices until in the ENGINEER's sole opinion, the devices are no <br />longer necessary (such time not to extend past the date the OWNER formally <br />accepts the project as complete). Before beginning construction, submit to Indian <br />River County for review and approval, a Stormwater Pollution Prevention Plan <br />(SWPPP), prepared by the certified erosion control subcontractor. Construction <br />shall not begin until the SWPPP has been approved by Indian River County. <br />Submit the approved SWPPP to the ENGINEER before beginning construction. <br />Include in the SWPPP, the "Contractor's Affidavit Regarding Erosion Control and <br />Treatment of Dewatering Water and Stormwater From the Construction Site" <br />(located at the end of this Section). <br />1.6 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS <br />DEFINED <br />A. With respect to this Section and as may be further defined in paragraphs 1.6.B, <br />1.6.C, and 1.6.D, "pollution" is the presence in off-site waters of any substances, <br />contaminants, or manmade or human -induced impairment of off-site waters or <br />01025-6 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1413-Martin Luther King Walking Trail\Admin\bid documents\Master Contract <br />Documents\Technical Specifications.doc <br />